Download Print this page

Cisco IP DECT 6800 Series Hardware Installation page 12

Hide thumbs Also See for IP DECT 6800 Series:

Advertisement

Mount the Base Station on the Wall
• With the ceiling mount bracket: Hold the bracket over the holes and screw in the screws until the bracket
doesn't move.
Step 5
Connect the Ethernet cable to the base station and route the cable through the slot in the base station.
Step 6
Plug the power adapter into the device and route the cable through the slot in the device.
Step 7
Put the device on the wall.
• Without the ceiling mount bracket: This diagram shows the alignment of the screw heads and the device.
This diagram shows how you seat the device on the screw heads.
Hardware Installation
12
Hardware Installation

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Ip dect 6825Ip dect 210