Download Print this page

Panasonic CF-WEB194AC Service Manual page 20

Car mounter toughbook

Advertisement

4.1.7.
Assembling and attaching the Docking PCB Ass'y
1. Connect 2 FFC DU CN to the Connecter (CN902,CN903) and attach the Cable and the I/O Antenna Plate 2 to the DU Angle
Ass'y.
2. Attach the DU CN Gasket and the Dockleg Cover Sheet to the IO Dock Leg.
3. Attach the DU Angle Ass'y and the IO Dock Leg to the Docking PCB and fix with 2 Screws <N3>. No.1 to No.2.
4. Attach 2 DU CON Cover Spacers to the DU CON Cover.
5. Attach the FFC Protect Sheet and the MODEM PCB Insulation Sheet to the DU Leg Plate.
6. Attach the DU CON Cover and the DU Leg Plate to the Docking PCB and fix with 3 Screws <N2>. No.3 to No.5.
7. Connect the Cable to the Connecter (CN905,CN906).
8. Attach the DU Spacer Left/Right and the Docking PCB Ass'y to the Base Plate Ass'y and fix with 4 Screws <N2>.
No.6 to No.9.
Screws <N2>:DRSB3+6FKL
Screws <N3> : DXSN2+8FNL
<N2>
:No.6
DU CON Cover
DU CON Cover Spacer
DU Angle Ass'y
Insulation Sheet CN
Docking PCB
Connector(CN903)
FFC DU CN
DU CN Gasket
IO Dock Leg
<N3> :No.1
Dockleg Cover Sheet
DU Leg Plate
<N2> :No.4
<N2> :No.5
MODEM PCB Insulation Sheet
Connector(CN905)
<N2>
:No.7
<N2>
<N2>
:No.9
:No.8
Connector(CN902)
<N3> :No.2
FFC Protect Sheet
<N2> :No.3
Connector(CN906)
Base
Plate Ass'y
4-12

Advertisement

loading