Rack Mount Requirements

You can rack mount your Visual Effects and Finishing system. Plan for
sufficient space in your rack mount chassis to install the following components:
An HP xw9400 system
An AJA OEM-2K breakout box
A Miranda DVI-Ramp2, if your workstation uses one
A Stone
Additional Stone Direct expansion chassis (XE model), as required
The form factor units of these components are provided in the following table.
Component
HP xw9400
AJA OEM-2K breakout box
Miranda DVI-Ramp2
Stone Direct storage chassis (XR)
Stone Direct expansion chassis (XE)
(each)

Avoiding Damage from Static Electricity

When installing any hardware equipment, take the following precautions to
prevent damage to sensitive components from static discharge:
Make sure power is turned off on the component you are working on. It
is a good idea to unplug components until all other connections are
configured.
Always wear a grounded static wrist strap. Attach the strap's alligator clip
to any grounded metal surface on the component's chassis that you are
working on. Place the wristband around your wrist.
®
Direct storage chassis (XR model)
Quantity
Form
Factor
1
5U
1
1U
1
1U
1
2U
1
2U
Rack Mount Requirements | 9
Required Rack
Space
5U
1U
1U
2U
2U