2.2

Uncrating the new UPS equipment 50kVA:

Upon receipt of the UPS, a careful inspection for shipping damage should be made. Units
shipped within North America are shrink-wrapped, those outside North America are crated.
2.
Unbolt the rails from both the unit and the
shipping pallet. Place the rails on the
front of the pallet. Use the six ½x3" bolts
to secure the rails to the shipping pallet.
Attach the rails as shown to the rear of
the pallet.
2.3
3.
Place the tie brackets in the slots at the
lower end of the ramps. SLOWLY roll
the unit down the ramp.
DANGER
TOSHIBA
1.
Remove packing material.
1a. For international units,
remove the screws that
attach the shipping crate to
the pallet. Remove the crate
and foam packing material.
TOP HEAVY EQUIPMENT. IMPROPER LIFTING CAN RESULT IN INJURY OR DEATH.
LIFT AND MOVE CAREFULLY AND ONLY WITH ADEQUATE EQUIPMENT AND TRAINED
PERSONNEL. THIS EQUIPMENT WILL TIP OVER EASILY UNTIL FIXED IN PLACE.