Unpacking; General Instructions; Unpacking The Scib Energy Storage Cabinet - Toshiba G9000 Series Installation And Operation Manual

Scib energy storage system
Hide thumbs Also See for G9000 Series:
Table of Contents

Advertisement

4

Unpacking

4.1

General Instructions

Unpack the SCiB Energy Storage Cabinet indoors on a paved floor. The system should be as close as possible to its final
location. Allow enough space for forklift operations to unpack the units from their packing crates. Then remove the crates.
Properly dispose of the crate.
Points to observe:
Retain all small articles during unpacking and installation.
Make sure that exterior paint is not scratched and that no cabinets are damaged before uncrating.
DO NOT damage the units when using tools to remove packaging materials.
If provided, DO NOT remove the protective plastic sheet cover until installation.
Immediately report any abnormalities to Toshiba Customer Support Center or an authorized representative.
4.2

Unpacking the SCiB Energy Storage Cabinet

1. Remove the crate sections B-D from the shipping pallet section A as shown in Figure 4.1.
2. Remove shrink wrap and honeycomb packing from the cabinet.
3. Carefully inspect the SCiB Energy Storage Cabinet for shipping damage.
10
CAUTION
TOP HEAVY EQUIPMENT. THIS EQUIPMENT WILL TIP OVER EASILY
UNTIL FIXED IN PLACE.
Lift and move carefully, and only with adequate equipment and trained
personnel. IMPROPER LIFTING CAN RESULT IN INJURY OR DEATH.
G9000 Series SCiB Energy Storage Cabinet Installation and Operation Manual – 98485-002

Advertisement

Table of Contents
loading

Table of Contents