System Installation
OML/VDI and N5293A/5A Test Heads – Banded Configuration Calibration (Only)
4. Configure the power sensor for measurements
5. Use the millimeter Wave Configuration Dialog to configure the modules.
6. Select the installation menu to start the calibration of the system
7. Complete the calibration steps, for optimal performance all steps should
Detailed Procedure
The following set of descriptions are intended to walk through the individual
steps needed to complete the calibration of the banded setup:
Figure 3-15
Millimeter Configuration Dialog Box
1. Assign a name to the configuration in this example we use "WR10
2. Assign the ports on the N5292A to which the Frequency extenders will be
3. Set the RF and LO Multipliers, 6 and 8 in this example.
4. Assign Test Set to be a N5292A and the ports for the modules to be
5. Click the "Installation Cal" button. The following dialog will appear.
3- 22
be completed.
Module".
connected.
connected.
Keysight Self-Configured System Installation Guide