AEG Fluxpower HE Series Installation And Start-Up Manual page 53

Hide thumbs

Advertisement

START UP
9
FROM MBCB
CLOSE OCB
START UP
10
FROM MBCB
CLOSE MBCB
INVERTER
11
START WAIT
PLEASE
START UP
FROM MBCB
12
MOVE BYP –
SWITCH
START UP
13
END WAIT
PLEASE
UPS MODEL
14
OUTPUT
VOLTAGE
The load is fed by the static bypass
switch. Circuit breaker MBCB is still
Close OCB
closed. LED #7 lit green.
The load is fed by the static bypass switch
and the inverter can be started. LED #8
Open MBCB
off.
The modulation of the inverter bridge is
started. The AC voltage reaches the
nominal value. The microprocessor
checks the synchronization with the
bypass line.
The load is transferred to the inverter.
Move the
LED #5 lit green.
selector
"NORMAL-
BYPASS" to
NORMAL
The microprocessor checks that all the
output parameters (voltage, current,
frequency) are within the tolerance limits
53