Chapter 1
Install the Bay and Backplane Connections
NTP-E2 Install the Bay Assembly
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
This unit must be installed in a rack that is secured to the building structure. Statement 205
Warning
Warning
To prevent airflow restriction, allow at least 24 inches (60 cm) of clearance around the ventilation
openings.
Warning
To prevent the system from overheating, do not operate it in an area that exceeds the maximum
recommended ambient temperature of:
122°F (50°C). Statement 1047
Complete the
Step 1
page
Complete the
Step 2
Complete the
Step 3
Continue with the
Step 4
Stop. You have completed this procedure.
78-17203-01
This procedure explains how to install the bay assembly at the site.
Ratchet
6-inch (or greater) ratchet extension (optional)
1 1/8-inch socket
15/16-inch socket
Rectangular seismic washers (4) (53-2141-XX)
5/8-inch floor anchor bolts (4)
NTP-E1 Unpack and Inspect the ONS 15600 Bay Assembly, page 1-4
Required
Onsite
None
"DLP-E109 Drill Holes to Anchor and Provide Access to the Bay Assembly" task on
17-9.
"DLP-E3 Install the Dollies onto the Bay Assembly" task on page
"DLP-E4 Install the Bay Assembly" task on page
"NTP-E3 Open and Remove the Front Door" procedure on page
NTP- E2 Install the Bay Assembly
16-3.
16-6.
1-6.
Cisco ONS 15600 Procedure Guide, R7.0
1-5