Resistance Measurements - LG 60PC1D Training Presentation

Advanced dual scan pdp troubleshooting
Hide thumbs Also See for 60PC1D:
Table of Contents

Advertisement

FPC (Flexible Printed Circuit) Removal for Z Board Replacement
Pull out Lock as shown in circles

Resistance Measurements

VS 6 meg
VA 5 meg
5v
3.3 meg
B11 to Chassis Ground 5 meg
Chassis Ground to SUS_OUT 4 meg
SUS_OUT to VS 2.7 meg
ER low to ER 10 4.9 meg
ER 10 to ER High 2.7 meg
18v to Chassis Ground 7.9K
SUS_UP to Chassis Ground 10K
SUS_DN to Chassis Ground 1.3meg
ER_UP to Chassis Ground 10K
ER_DN to Chassis Ground 10K
Plasma Display Panel Troubleshooting - 2007
Pull Lock apart to remove
( use any PCB mounting screw for Ground )
*Measurements made with the board disconnected
negative lead of the meter to ground.
77
Troubleshooting
Pull FPC Connector as shown in arrow.

Advertisement

Table of Contents
loading

Table of Contents