Electrical / Main Terminal Wiring - TdA ZK300DC Installation And User Manual

Swing gate operator
Table of Contents

Advertisement

ZK300DC SWING GATE OPERATOR USER'S MANUAL

9. Electrical / Main Terminal Wiring

Connect the operator to the control box as shown in Fig.14.
Connect primary motor that on the primary gate (with electric lock) to MOTOR A, connect
the secondary gate to MOTOR B. (See Fig.14)
Fig.12
Fig.13
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents