IBM 3274 Planning, Setup, And Customizing Manual page 120

Information display system
Hide thumbs Also See for 3274:
Table of Contents

Advertisement

Weeks
Responsibility
Before
Schedule
Delivery
Date
Customer
IBM
v'
Event
X
Arrange for the installation of (1)
the device cables between the
3274 and the attached units
and (2) the power receptacles,
wiring, etc.
X
Define a training program for
employees.
X
Order the required 3274, 3278,
3279, 3287, and 3289 manuals.
10
X
Review the progress of the data
communication plan. Identify
and resolve any schedule conflicts.
9
X
X
Review the cluster configuration
to make sure the configuration
meets your requirements. Make
any necessary changes to your
order.
8
X
X
Review the installation plan to
define any exposure to schedule.
X
X
Confirm the arrival of package
containing cluster cables.
X
Start installing and labeling cluster
cables and power receptacles.
6
X
Start employee training.
X
IBM representative checks progress
of site preparation.
4
X
Receive suppl ies (magnetic
stripe cards, forms, etc.).
X
Complete the installation of cables
and power receptacles.
2
X
Complete the checkout of the
cables and power: continuity and
pplarity tests of cluster cables,
power receptacles, and safety
considerat ions.
X
Complete the required changes to
the existing programs and data
processing units.
X
Complete the site preparation.
X
Install communication facilities
(telephone line and modems).
X
Make sure all the necessary
information is available for the
setup personnel (switch settings,
configuration information,
customizing form, etc.).
X
Review setup instructions with the
setup personnel.