Chapter 10 Jog Operation - Mitsubishi Electric MELSEC Q Series User Manual

Positioning module
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

CHAPTER 10
The QD73A1's "JOG operation" can move the workpiece without using positioning data, but according to signal inputs
and specified movement amount. Use this function for the following.
• To check the connection of a positioning system
• To obtain the address of positioning data
• To move the workpiece in the direction where a limit signal turns on if operation stopped when a limit signal
turned off
"JOG operation" moves the workpiece in the specified direction at the specified speed while Forward JOG start signal
(Y24) or Reverse JOG start signal (Y25) is on.
200
JOG OPERATION

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec-q qd73a1

Table of Contents