Check Sheet for the Periodic Inspection of the
Breaker
Copy this page for future use, and store it in a safe place near the machine to document your periodic
inspections of the breaker.
■
How to Inspect the Breaker Periodically
Follow the procedure described in "Periodic Inspection of the Breaker, " on p. xxviii, once or twice a month.
■
How to Fill in This Check Sheet
Fill in the date of inspection and the name of the inspector.
When the inspection is completed successfully, write a check mark under "OK. "
If not, contact your local authorized Canon dealer. (Also, write a check mark under "NG" (No Good).)
Date of
Inspection
xxx
Result
Inspector
OK
Date of
Inspection
NG
Result
Inspector
OK
NG