Corrections After Measurement Of The Zero Point - Siemens SINUMERIK Series Operating Manual

Milling
Hide thumbs Also See for SINUMERIK Series:
Table of Contents

Advertisement

Procedure
4.6.11

Corrections after measurement of the zero point

If you store the workpiece zero in a work offset, changes to the coordinate system or axis
positions might be necessary in the following cases.
● Correcting the work offset causes the workpiece coordinate system to rotate, after which
the tool can be aligned perpendicularly to the plane.
● Correcting the work offset necessitates positioning of the rotary axis in order to align the
workpiece parallel with the coordinate system
Activation windows help you to adapt the coordinate system and the axis positions.
Procedure
Activating work offset
Milling
Operating Manual, 08/2018, 6FC5398-7CP41-0BA0
1.
The "Measure workpiece zero" function is selected.
2.
Press the softkey that you wish to assign to a new measurement version,
e.g. "1 circular spigot".
The "1 Circular Spigot" window opens.
3.
Open the list of measurement versions, select the desired measurement
version using the <Cursor down> and the <Input> keys.
- OR -
Using the <Select> key, in the drop down list box, select the desired
measurement version, e.g. "Align plane".
The "Align plane" window opens.
4.
Enter the required parameter in order to make the measurement as usual.
- OR -
Press the "Back" softkey.
The selected softkey is assigned the new measurement version, in this
case, "Align plane".
You stored the workpiece zero in a work offset that was not active during
measurement.
Setting up the machine
4.6 Measuring the workpiece zero
137

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinumerik 840d slSinumerik 840de slSinumerik 828d

Table of Contents