Yumpu YCP024F1L-M Installation Operation & Maintenance page 6

Single package gas/electric 12 seer convertible
Table of Contents

Advertisement

®
CONVERTING
HORIZONTAL
TO DOWNFLOW
HEATER
EXCHANGER
TUBES
HORIZONTAL
SUPPLY
AIR
COVER
SHEET
METAL
HORIZONTAL
RETURN
SCREWS
AIR
COVER
NOTE
SUPPLY
OPENING
1. REMOVE
SCREW
NEAREST
TO THE
OPENINGAND
PULLTHE
PANEL FIRMLY
TOWARD THE OUTSIDE
OF THE U NIT TO
DISENGAGE
THE BACK ATTACHMENT.
RETURN OPENING
2. REMOVE
RIGHT
HAND
SCREW
AND
MOVE
PANEL
TO THE
RIGHT
OR RE-
MOVE BOTH SCREWS.
®
REQUIRED
CLEARANCE
FOR UNIT INSTALLATION
AND ROOF
PENETRATION
HOLE SiZE REQUIRED
SERVICE
CLEARANCE
LINES
SERVICE
CLEARANCE
LINES
SIDE RAIL
Y
J
WOOD NAILER"
SERVICE CLEARANCE
& PENETRATION
DIMENSIONS
MODEL NO.
A
B
C
D
E
F
YCPO24-036F-L/M
42"
30"
*6"
24"
36"
25"
YCP036F-H
42"
30"
"12"
30"
44"
25"
YCP42F-M
YCP048F-H,
060F-M
42"
30"
"12"
36"
50"
25"
* 18" WITH FRESH AIR ACCESSORY
* 30" WITH ECONOMIZER
HOLE IN ROOF
Page 6
Dwg. No. X664209 P01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents