™ 26' Wide Econoline Storage Building Photo may show a different but similar model. STK# DIMENSIONS 108299F 26' W x 12' H x 20' L 108300F 26' W x 12' H x 25' L 108301F 26' W x 12' H x 30' L...
• Never erect the structure under power lines. • Identify whether underground cables and pipes are Thank you for purchasing this ClearSpan™ shelter. When present before preparing the site or anchoring the properly assembled and maintained, this product will structure.
These words and phrases are common to most ends of a pipe can be inserted into couplers and the ClearSpan™ shelters and identify the different parts of straight ends of other pipes of the same diameter. the shelter. (Some are used in this document. Others may •...
CLEARSPAN POLY BUILDINGS ™ REQUIRED TOOLS SPECIAL NOTE: Baseboards for Frame The following list identifies the main tools needed to These instructions recommend installing a baseboard assemble the shelter. Additional tools and supports may be under the mounting feet along each side of the frame. The needed depending on the structure, location, and baseboard runs from the front to the back of the building.
Page 5
CLEARSPAN POLY BUILDINGS ™ The following graphics and photos will help you identify the different parts of the building. Consult the Quick Start Guide for additional details and diagrams. (All parts are not shown.) FA4482B Tek Screw 102857 102547 End Clamp Cross Connector QH1400 &...
Page 6
CLEARSPAN POLY BUILDINGS ™ ClearSpan ™ Econoline Storage Building The instructions that follow describe assembling all rafters and then constructing the frame. Depending on the number of individuals assisting with the construction, it may be best and more efficient to have someone assemble the rafters and others assemble the frame as rafters are completed.
Page 7
CLEARSPAN POLY BUILDINGS ™ LAY OUT THE BUILDING SITE NOTE: Setting customer-supplied baseboards on the site in the correct positions is another way to prepare After the site is prepared, identify the location of the shelter for the frame assembly.
Page 8
CLEARSPAN POLY BUILDINGS ™ ASSEMBLING THE RAFTERS 3. With the main rafter pipes seated at each joint and the rafter positioned on a flat surface, secure each joint NOTE: Assistance is required to assemble the rafters. using a single self-tapping Tek screw. Position Tek screw approximately 1'' from pipe joint.
Page 9
CLEARSPAN POLY BUILDINGS ™ 2. Repeat step to attach the remaining rafter foot. RAFTER ASSEMBLY (CONTINUED) View below shows how to position all end clamps to 3. Repeat the above procedure for all rafter assemblies. prepare for the frame assembly. Purlin pipe shown is installed during the frame assembly procedure.
CLEARSPAN POLY BUILDINGS ™ FRAME ASSEMBLY 3. Using the on-center, rafter-to-rafter spacing, set an inside rafter in position. (Additional assistants are Gather the parts: required to hold the inside rafter in position.) See Side Profile diagrams for the correct rafter spacing.
Page 11
CLEARSPAN POLY BUILDINGS ™ FRAME ASSEMBLY (CONTINUED) If the last end rafter is plumb and the purlin run extends beyond the end of the rafter, cut the last section of 8. Move to the lower end of the rafters, verify that the purlin pipe to the required length.
Page 12
CLEARSPAN POLY BUILDINGS ™ FRAME ASSEMBLY (CONTINUED) 2. Verify that the width of each rafter is 26' center-to- center. The frame is square when the two diagonal 2. Remove the bolts and attach a strut between the band measurements are the same. See previous diagram.
Page 13
CLEARSPAN POLY BUILDINGS ™ PREPARE MAIN COVER These cover conduits are inserted into the pockets sealed to the main cover. The cover conduits are used Gather the parts: to tighten and secure the main cover. • Ratchet (1") 3. After assembling the cover conduits, locate the main cover and unfold it on a clean, smooth surface near the •...
Page 14
CLEARSPAN POLY BUILDINGS ™ PREPARE MAIN COVER (CONTINUED) 5. Divide the remaining number of ratchets in half. Place the ratchets on the ground next to the rafter where they NOTE: Depending on the length of the cover it may will be attached.
Page 15
12. After the side ratchets are tightened, return to the front NOTE: With the exception of Truss Arch buildings, and back end ratchets and tighten. ClearSpan™ shelters and greenhouses do not have any tested loading criteria. NOTE: Loosen the ratchets if needed to remove excess strap and retighten.
Page 16
CLEARSPAN POLY BUILDINGS ™ 12'-10 7/8" Height QUICK START GUIDE 26' Wide Econoline Storage Building 26'-0" Width Center To Center 26'-5 1/2" Width Edge To Edge FRONT Grid Represents 12" Squares Frame shown may differ in length from actual frame.