Range Planning - Siemens Desigo TRA Mounting And Installation Manual

Table of Contents

Advertisement

STEP 1: Floor plan and
compass
STEO 2: Draw relevant
RF shielding on the floor
plan
Siemens
Building Technologies
11.6

Range planning

RF range is typically limited by fire protection walls that are considered shielding.
Within fire protection areas, light walls or glass partitions with solid RF properties
are often used. Avoid metal reinforcement or metalized glass!.
The following diagrams illustrate how to implement a reliable RF plan in three
steps.
• Fire protection walls
• Elevator shafts, stairwells and other supply areas
Mounting and installation
EnOcean RF networks
51 / 56
CM111043en_03
2013-02-23

Advertisement

Table of Contents
loading

Table of Contents