ClearSpan 107769 Manual

34' wide free-standing building

Advertisement

Quick Links

CLEARSPAN
POLY BUILDINGS
ClearSpan
34' Wide Free-Standing Building
Photo may show a model of a different length.
STK#
DIMENSIONS
©2008 ClearSpan™
All Rights Reserved. Reproduction
107769
34' W x 17' H x 40' L
is prohibited without permission.
Revision Date: 03.13.08
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 107769 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for ClearSpan 107769

  • Page 1 ™ ClearSpan ™ 34' Wide Free-Standing Building Photo may show a model of a different length. STK# DIMENSIONS ©2008 ClearSpan™ All Rights Reserved. Reproduction 107769 34' W x 17' H x 40' L is prohibited without permission. Revision Date: 03.13.08...
  • Page 2: Safety Precautions

    • Never erect the structure under power lines. • Identify whether underground cables and pipes are Thank you for purchasing this ClearSpan™ shelter. When present before preparing the site or anchoring the properly assembled and maintained, this product will structure.
  • Page 3: Assembly Procedure

    These words and phrases are common to most ends of a pipe can be inserted into couplers and the ClearSpan™ shelters and identify the different parts of straight ends of other pipes of the same diameter. the shelter. (Some are used in this document. Others may •...
  • Page 4: Required Tools

    CLEARSPAN POLY BUILDINGS ™ REQUIRED TOOLS SPECIAL NOTE: Baseboards for Frame The following list identifies the main tools needed to These instructions recommend installing a baseboard assemble the shelter. Additional tools and supports may be under the mounting feet along each side of the frame. The needed depending on the structure, location, and baseboard runs from the front to the back of the building.
  • Page 5 CLEARSPAN POLY BUILDINGS ™ The following graphics and photos will help you identify the different parts of the building. Consult the Quick Start Guide for additional details and diagrams. (All parts are not shown.) FAH325B & FALB32B FA4482B Tek Screw Carriage Bolt &...
  • Page 6 CLEARSPAN POLY BUILDINGS ™ ClearSpan ™ Free-Standing Building The instructions that follow describe assembling all rafters and then constructing the frame. Depending on the number of individuals assisting with the construction, it may be best and more efficient to have someone assemble the rafters and others assemble the frame as rafters are completed.
  • Page 7 CLEARSPAN POLY BUILDINGS ™ LAY OUT THE BUILDING SITE NOTE: Setting customer-supplied baseboards on the site in the correct positions is another way to prepare After the site is prepared, identify the location of the shelter for the frame assembly.
  • Page 8 CLEARSPAN POLY BUILDINGS ™ ASSEMBLE THE FREE-STANDING BUILDING COMPONENTS NOTE: Assistance is required to assemble the shelter. ATTENTION: After assembling the end rafters, set the END RAFTER ASSEMBLY (2) two (2) identical rafters aside in an accessible place. One rafter is used at each end of the frame during the Gather the parts: assembly.
  • Page 9 CLEARSPAN POLY BUILDINGS ™ INTERIOR RAFTER ASSEMBLIES Gather the parts: • Rafter pipe (#34R23S1D) • Rafter pipe (#34R23S1) & rafter pipe (#34R23P2) • Rafter foot (#104302) Tek screws (#FA4482B) & • FAG363B 3/8" x 3" bolt and FALB04B 3/8" nut •...
  • Page 10: Frame Assembly

    CLEARSPAN POLY BUILDINGS ™ 1. Stand the first end rafter and secure it using rope, INTERIOR RAFTER ASSEMBLIES (CONTINUED) cable, or some other form of temporary bracing to hold Assemble Interior Rafters Without Attached Ratchets the rafter in position. Use a level (or other leveling 1.
  • Page 11 CLEARSPAN POLY BUILDINGS ™ FRAME ASSEMBLY (CONTINUED) NOTE: To prevent cover damage, do not allow the purlin to extend beyond the edge of the end rafter. See 4. With the first end rafter standing, plumb, properly dashed line in previous diagram for details.
  • Page 12: Cable Assembly

    CLEARSPAN POLY BUILDINGS ™ CABLE ASSEMBLY Cable assemblies provide diagonal bracing for the building. Each cable assembly includes the following items: • Cable (2 cables cut to length) ATTENTION: Consult the diagram on the next page to • Turnbuckle (1) identify cable assemblies and cable locations.
  • Page 13 CLEARSPAN POLY BUILDINGS ™ CABLE ASSEMBLY (CONTINUED) 5. Install a second cable clamp on the cable six to eight (6"-8") inches from the first clamp and tighten both clamps. 6. Remove the bolt from the jaw of the turnbuckle and position the cable end with the thimble into the turnbuckle jaw.
  • Page 14: Cable Placement

    CLEARSPAN POLY BUILDINGS ™ CABLE PLACEMENT The diagram and inserts below identify the placement and ATTENTION: Install a Carriage Bolt proper way to attach the cable assemblies to the building. carriage bolt in this location at both ends of the shelter.
  • Page 15 CLEARSPAN POLY BUILDINGS ™ ANCHOR THE SHELTER INSTALL THE RATCHETS FOR THE MAIN COVER After installing all cable assemblies, anchor the frame. The ratchets are attached to the legs of end rafters on the Once the frame is anchored properly, continue with these outside of the rafter leg.
  • Page 16 CLEARSPAN POLY BUILDINGS ™ PREPARE MAIN COVER Gather the parts: • Pipe 1.66" x 99" swaged (#166S099) • Pipe 1.66" x 93" plain (#166P093) • Main cover • Tek screws Assembly Procedure NOTE: When handling the main cover and setting it in position, do not pull on the end straps. They will pull out of the cover bonnet pocket.
  • Page 17 CLEARSPAN POLY BUILDINGS ™ ATTACH MAIN COVER 4. Once the main cover is pulled into position, center the cover on the frame (end-to-end and side-to-side). Gather the parts: WARNING: To prevent damage and injury, do not • Main cover (with conduits inserted) leave the cover unattended if it has not been properly •...
  • Page 18 CLEARSPAN POLY BUILDINGS ™ INSTALL THE MAIN COVER SIDE STRAPS NOTE: Depending on the where the ratchet is attached to the rafter, cut the strap to the proper length. If bulk The side straps wrap around the conduit through slits strap is used, measure and cut to length as needed.
  • Page 19 Photo shows the ratchet NOTE: With the exception of Truss Arch buildings, attached to the end ClearSpan™ shelters and greenhouses do not have any rafter. This ratchet is used to secure the tested loading criteria. bonnet portion of the main cover.
  • Page 20 CLEARSPAN POLY BUILDINGS ™ 17'-0 1/16" Height QUICK START GUIDE 34' Wide Free-Standing Building 34'-0" Width FRONT Grid Represents 12" Squares Revision Date: 03.13.08...
  • Page 21 CLEARSPAN POLY BUILDINGS ™ Revision Date: 03.13.08...
  • Page 22 CLEARSPAN POLY BUILDINGS ™ Revision Date: 03.13.08...
  • Page 23 CLEARSPAN POLY BUILDINGS ™ Revision Date: 03.13.08...
  • Page 24 CLEARSPAN POLY BUILDINGS ™ Revision Date: 03.13.08...
  • Page 25 CLEARSPAN POLY BUILDINGS ™ Space below is reserved for customer notes. Revision Date: 03.13.08...

Table of Contents