Installing New Load Cell - Siemens SITRANS WW100 Operating Instructions Manual

Weighfeeders
Hide thumbs Also See for SITRANS WW100:
Table of Contents

Advertisement

7. Remove the two bottom load cell mounting bolts.
The load cell is now held in place only by the shipping bolt.
8. Remove the shipping bolt, and slide the load cell off the mount.
Note
Load cell may appear different than shown.
7.9.2

Installing new load cell

1. Slide the new load cell into position.
Carefully thread the load cell shipping bolt. Do not overtighten the bolt.
2. Install the two bottom load cell mounting bolts and tighten them by hand.
The load cell should now be resting against the overload bolt.
3. Install the two top/front load cell mounting bolts. Tighten them by hand.
4. Start with the bottom load cell mounting bolts and tighten them to the torque value indicated
in the load cell instructions. Now tighten the two top/front load cell mounting bolts to the
same torque value.
5. Remove the shipping bolt.
6. Route the load cell cable to the junction box and connect the load cell according to the
supplied interwiring diagram.
Note
Once the load cell has been replaced, check the weigh deck alignment with the approach
and retreat slider beds.
Alignment should be +1/32" (+0.8 mm) to 0" (0 mm).
SITRANS WW100
Operating Instructions, 06/2018, A5E33560618-AC
1
2
3
4
5
Weigh deck
Load cell
Overload bolt
7.9 Load cell replacement
Shipping bolt
Bottom load cell mount
Commissioning
33