How To Place The System In 'Commissioning Mode - Honeywell GENT Nano panel-based Commissioning Instructions

Fire detection and alarm system
Table of Contents

Advertisement

Commissioning instructions

How to place the system in 'Commissioning mode'

You can place all the zones of the system in test state by entering the Commissioning mode, which causes all the zones of the system to enter test state. Notice the common fire light will remain lit until
you exit the Commissioning mode. To enter the Commissioning mode you need to be at access level 4.
Menu
Engineering
Select
TEST FIRE
Manual Call point
Audible
Buzzer
Test Key
key
Test Fire
Alarm
On
Flashing
62
Loop
>
Select
Select
Control
FIRE MESSAGE
ZONE 1
After a short
First fire indication
(flashing LED)
FIRE
Common fire LED
(Steady indication)
(red LEDs)
The PLANT equipment will not
operate during 'Fire Test' condition.
Commission
>
Select
Select
Enter
Select
Select
Exit
AUTOMATIC
Silence
duration.
Alarms
Audible
Test Fire
Buzzer
Alarm
16:15 Tue 16/02/10
Enter Commissioning mode
Warning!
Entering 'Commissioning Mode' causes all
zones to enter test state.
ARE YOU SURE YOU WISH TO PROCEED?
Yes
No
16:15 Tue 16/02/10
Exit Commissioning mode
Warning!
Entering 'Commissioning Mode' causes all
zones to leave test state.
ARE YOU SURE YOU WISH TO PROCEED?
Yes
No
ZONE 1
After a short
Fire indication
duration.
(LED Off)
FIRE
Common fire LED
(Red - Steady indication)
4188-949 issue 3_05/10_Nano Comms inst.
Test
Yes
Test
Yes