Download Print this page

Wiring Works - Samsung MIM-E03 N Series Installation Manual

Control kit
Hide thumbs

Advertisement

Wiring works

• Field-supplied electrical components such as power switch, circuit breakers, wires, terminal blocks, etc must be
properly chosen with compliance with national legislation or regulation .
CAUTION
• Switch off the power supply before making any connections .
• All field wiring and components must be installed by a licensed electrician .
• Use a dedicated power supply .
• All power connections must be protected from dew condensation by thermal insulation .
• The system shall be earthed . Do not earth the unit to a utility pipe, surge absorber or telephone earth .
Incomplete earth may cause electrical problems .
Layout of PCB
SMPS circuit
No.
EHS MONO Kit-EU_IM_05388A-04_EN.indd 9
Micom
LED
Load control
FR Control
CNS2(Green)
Flow Switch
CNS041(Blue)
Water Tank
CNS042(Yellow)
Heater Out(Mono)
CNS047(Black)
Mixing Sensor
CNS045(Blue)
Room Sensor
CNS044(White)
Smart Grid
CNS046(Red)
④ ⑤ ⑥ ⑦
2-WIRE COMM
EEPROM
Note
9
2016-06-23 오후 3:42:57

Advertisement

loading

  Also See for Samsung MIM-E03 N Series

  Related Manuals for Samsung MIM-E03 N Series