7210 SAS-D CHASSIS INSTALLATION GUIDE List of Tables System Overview ............11 Table 1 7210 SAS-D AC Chassis Front Panel Features ....... 17 Table 2 7210 SAS-D DC Chassis Front Panel Features ....... 19 Table 3 Power LEDs ................21 Table 4 External AC Power Supply Description ........
System Overview ............11 Figure 1 7210 SAS-D AC Chassis Front Panel ........16 Figure 2 7210 SAS-D ETR AC Chassis Front Panel ....... 16 Figure 3 7210 SAS-D DC Chassis Front Panel ........18 Figure 4 7210 SAS-D ETR DC Chassis Front Panel....... 18 Figure 5 AC and DC Power Supplies .............
Nokia 7210 SAS-D, and instructions to install and configure the system software. Each 7210 SAS-D switch is shipped with a power cord (AC or DC) and rubber feet. Optionally, a rack-mounting bracket kit, a wall-mounting bracket kit, and external AC or DC power module and bracket kit (ETR-only) are available for order.
CLASS 1 LASER PRODUCT 1.1.4 Technical Support If you purchased a service agreement for the 7210 SAS-D and related products from a distributor or authorized reseller, contact the technical support staff for that distributor or reseller for assistance. If you purchased an Nokia service agreement,...
7210 SAS-D CHASSIS INSTALLATION GUIDE System Overview 2 System Overview This chapter describes the 7210 SAS-D features and includes the following sections: • Introduction, section 2.1 • Switch Architecture, section 2.2 • Features, section 2.3 • Hardware Description, section 2.4...
7210 SAS-D CHASSIS INSTALLATION GUIDE 2.1 Introduction The 7210 SAS-D is a service-aware Layer 3 switch with support for QinQ Layer 2 uplinks. The switch functions as an Ethernet demarcation and backhaul unit with support for four 10/100/1000 Base-T fixed copper ports and six 100/1000 SFP ports with line-rate switching on all the ports.
System Overview 2.2 Switch Architecture The 7210 SAS-D employs a wire-speed, non-blocking switching fabric. This permits simultaneous wire-speed transport of multiple packets at low latency on all ports. The switch also features full-duplex capability on all ports that effectively doubles the bandwidth of each connection.
Note: The 7210 SAS-D is equipped with a fan that provides air circulation in order to better regulate the air temperature inside the chassis. The fan does not perform a cooling function.
7210 SAS-D CHASSIS INSTALLATION GUIDE System Overview 2.3.1 Connectivity The 7210 SAS-D includes the following connectivity features: • 100/1000 fiber-optic SFP ports and 10/100/1000 Base-T copper SFP ports full-duplex connections. The SFP ports allow for use of 10/100/1000 Base-T copper SFPs.
Figure 1 7210 SAS-D AC Chassis Front Panel 7210SASac_0001A Figure 2 7210 SAS-D ETR AC Chassis Front Panel 7210SASac_0001B Table 1 lists the front panel features of the 7210 SAS-D AC chassis variants. 3HE 10087 AAAA TQZZA Edition 01 Issue: 08...
7210 SAS-D CHASSIS INSTALLATION GUIDE System Overview Table 1 7210 SAS-D AC Chassis Front Panel Features Description Power, System, and Port LEDs (ETR only: PS1 and PS2 status) 100/1000 SFP ports 10/100/1000 Base-T fixed copper ports RJ-45 Console port Power switch...
Figure 3 7210 SAS-D DC Chassis Front Panel 7210SASdc_0001A Figure 4 7210 SAS-D ETR DC Chassis Front Panel 7210SASdc_0001B Table 2 lists the front panel features of the 7210 SAS-D DC chassis variants. 3HE 10087 AAAA TQZZA Edition 01 Issue: 08...
Chassis ground connection point 2.4.3 Ethernet Interfaces The 7210 SAS-D provides six 100/1000 SFP ports. Each port can be used for a direct connection to a subscriber’s customer premises equipment (CPE), or as an uplink to another aggregation node. The 7210 SAS-D also provides four 10/100/1000 Base-T fixed copper ports.
Maintain at least 3 in. (7.62 cm) of clearance on all sides of the device to ensure proper air circulation through the chassis. Note: The 7210 SAS-D is equipped with a fan that provides air circulation in order to better regulate the air temperature inside the chassis. The fan does not perform a cooling function.
Page 21
7210 SAS-D CHASSIS INSTALLATION GUIDE System Overview Figure 5 AC and DC Power Supplies 7210SAS_0002 The power LED is located on the left hand side of the front panel, labeled as Pwr. Refer to Figure 8 Figure 9 for the location of the power LED.
The external power supply is available as an AC module or a DC module. Note: The 7210 SAS-D supports the detection of an internal power supply failure and an external backup power supply failure. For specifications on the external input power requirements, see section 7.
Page 23
Table 5 External DC Power Supply Description Description Front view of the external DC power supply Rear view of the external DC power supply Captive screw Power cable to the 7210 SAS-D chassis Issue: 08 3HE 10087 AAAA TQZZA Edition 01...
System Overview 7210 SAS-D CHASSIS INSTALLATION GUIDE 2.4.9 System and Port LEDs The system and port LEDs are located on the left-hand side of the front panel. See Figure 8 Table 6 for the location of the system and port LEDs and Table 7 LED behavior.
Page 25
7210 SAS-D CHASSIS INSTALLATION GUIDE System Overview Table 8 Port LED Behavior Condition Status 1/1/1 – 1/1/6 – SFP ports Green Indicates that the port has a valid 1/1/7 – 1/1/10 – Fixed link Copper ports Flashing green Indicates activity on the port...
AC or DC power is applied to the switch 2.4.11 Physical Security The 7210 SAS-D provides a security slot for attaching a lock-and-cable security apparatus. The security slot is located on the upper right side of the back panel of the chassis.
7210 SAS-D CHASSIS INSTALLATION GUIDE Installing the Chassis 3 Installing the Chassis This chapter describes site preparation and installation of the 7210 SAS-D and includes the following sections: • Site Preparation, section 3.1 • Installing the Switch, section 3.2 Issue: 08...
3.1 Site Preparation 3.1.1 Selecting a Site You can mount the 7210 SAS-D in a standard 19 in. (48.26 cm) equipment rack, on a flat surface, or on a wall. When mounting on a flat surface, ensure that the four rubber feet are installed on the bottom of the chassis.
Page 29
7210 SAS-D CHASSIS INSTALLATION GUIDE Installing the Chassis When a 7210 SAS-D is installed in an outside plant, such as a cell site, hut, cabinet, or outside plant enclosure, it must be installed in an environment where, except during installation and servicing, the compartment is sealed or properly filtered.
• Make sure you only use SFPs that are supported by Nokia. 3.1.4 Equipment Checklist After unpacking the switch, check the contents to make sure all the components are present.
3.2.1 Rack Mounting Before starting this procedure, ensure that you have the following items: • bracket mounting kit (sold separately as 3HE06696AA 7210 SAS-D rack mount kit) • four additional screws and washers (not provided in the Bracket Mounting Kit) for installing the switch in the rack •...
Page 32
Installing the Chassis 7210 SAS-D CHASSIS INSTALLATION GUIDE Figure 12 Installing the Switch in a Rack 7210SASac_0005 Step 3. If you are installing a single switch, proceed to section 3.2.4. Step 4. If you are installing multiple switches, repeat steps for each switch and ensure that the units are mounted one below the other.
Installing the Chassis 3.2.2 Desktop or Shelf Mounting Before starting this procedure, ensure you have the following: • four adhesive feet (provided with the 7210 SAS-D) • an available grounding point near the installation location To desktop-mount or shelf-mount the 7210 SAS-D: Step 1.
Installing the Chassis 7210 SAS-D CHASSIS INSTALLATION GUIDE Step 3. If you are installing a single switch, proceed to section 3.2.4. Step 4. If you are installing multiple switches, repeat steps for each switch. Then proceed to section 3.2.4. 3.2.3 Wall Mounting Before starting this procedure, ensure you have the following: •...
Page 35
7210 SAS-D CHASSIS INSTALLATION GUIDE Installing the Chassis Figure 14 Wall Mounting the Chassis 7210SASdc_0007 Step 3. Secure the chassis to the wall by hooking the two wall mounting screws into the wall mounting screw guides on the bottom of the chassis. Ensure that there are at least three inches of space on the front, sides, rear and top for proper air circulation.
Installing the Chassis 7210 SAS-D CHASSIS INSTALLATION GUIDE 3.2.4 Grounding the Chassis Warning: • HIGH LEAKAGE CURRENT: EARTH CONNECTION ESSENTIAL BEFORE CONNECTING SUPPLY. COURANT DE FUITE ÉLÉVE: Raccordement à la terre indispensable avant le raccordement au réseau. • Chassis ground cables are not included. Use only power cords that have a grounding (earthing) path.
7210 SAS-D CHASSIS INSTALLATION GUIDE Installing the Chassis To ensure that the equipment is connected to earth ground, use the following instructions to prepare the ground wire and make the connection. The ground wire is not provided. The length of the ground wire depends on the location of the switch and proximity to the proper grounding facilities.
Page 38
Installing the Chassis 7210 SAS-D CHASSIS INSTALLATION GUIDE Step 6. Connect the opposite end of the ground wire to the appropriate ground point at the installation site. Ensure that the switch ground connection is made according to local safety codes.
Installing the Chassis 3.2.5 Connecting to a Power Source The 7210 SAS-D switch is available with either an AC or DC internal power supply. The switch is also compatible with either an AC or DC external power supply available separately.
Installing the Chassis 7210 SAS-D CHASSIS INSTALLATION GUIDE Step 6. Check the power LED as the switch is powered on to verify that the LED indicating external power status is ON, and that the LED indicating internal power conversion is ON. If not, recheck the power source and power cable connections at the power source and at the power supply.
7210 SAS-D CHASSIS INSTALLATION GUIDE Installing the Chassis Warning: • The equipment under test (EUT) is specified for DC-I power configurations. The battery returns must remain isolated until they reach the main power bus. • In the DC-C configuration, the ampacity of the conductor connecting the...
Page 42
Installing the Chassis 7210 SAS-D CHASSIS INSTALLATION GUIDE Step 5. Check the power LED as the switch is powered on to verify that the LED indicating external power status is on, and that the LED indicating internal power conversion is on. If not, recheck the power source and power cable connections at the supply source and at power supply module.
7210 SAS-D CHASSIS INSTALLATION GUIDE Installing the Chassis Warning: If the power leads are plugged into the wrong holes, the power supply will not work properly and may damage the switch. Step 3. After the power source is tuned on, set the power button on the front of the power supply module to the ON position (marked –...
• a screwdriver (Phillips or flathead, depending on the type of screws used) To install the external power supply to the 7210 SAS-D ETR: Step 1. Assemble and secure the brackets to the front of the switch and the external power supply using the screws provided in the External Power Supply Mounting Kit.
7210 SAS-D CHASSIS INSTALLATION GUIDE Installing the Chassis Figure 19 Attaching the External Power Shelf (Rear View) 7210SASdc_0011 Step 3. Connect the external power supply power cable to the chassis. See Figure Figure 20 Connecting the External Power Supply to the Chassis 7210SASdc_0012 Step 4.
7210 SAS-D CHASSIS INSTALLATION GUIDE Transceivers 4 Transceivers This chapter describes how to replace Small Form Factor Pluggable (SFP) transceivers on ports that support these devices. • Warnings and Notes, section 4.1 • Installation Preparation, section 4.2 Issue: 08 3HE 10087 AAAA TQZZA Edition 01...
Transceivers 7210 SAS-D CHASSIS INSTALLATION GUIDE 4.1 Warnings and Notes Danger: Fiber-optic equipment can emit laser or infrared light that can injure your eyes. Never look into an optical fiber or connector port. Always assume that fiber-optic cables are connected to a light source.
Blow dry the ferrule with compressed air and inspect for lint. Do not insert the compressed air nozzle into the receptacle when blowing out. 4.2.1 Locking and Release Mechanisms Nokia SFPs can use different lock and release methods. Possible lock and release mechanisms include: •...
Transceivers 7210 SAS-D CHASSIS INSTALLATION GUIDE 4.2.2 Installing SFPs Figure 21 Installing SFPs al_0428 To install an SFP transceiver: Step 1. Remove the SFP from its anti-static packaging. Step 2. Holding the SFP by its sides, slide the unit into the port until it clicks into place.
Page 50
SFP optical port and place a dust cover on the fiber cable connector. Caution: The 7210 SAS-D does not use a fan for cooling and the SFPs might be hot to the touch. Avoid direct contact with the metal casing of the SFPs.
7210 SAS-D CHASSIS INSTALLATION GUIDE Configuring the System 5 Configuring the System This chapter describes how to configure the 7210 SAS-D and contains the following sections: • Diagnostics, section 5.1 • Initializing the System and Downloading Software, section 5.2 •...
Configuring the System 7210 SAS-D CHASSIS INSTALLATION GUIDE 5.1 Diagnostics 5.1.1 Post Installation Status After successfully installing and powering up the 7210 SAS-D, ensure that the LEDs show the following state: • Sys: GREEN • Power: GREEN If either LED shows a different state, toggle the power switch slowly and wait for a few seconds to let the system boot.
An RJ-45 serial cable that connects the console port of 7210 SAS-D to the serial port of a PC Connect the 7210 SAS-D console port to serial port of the PC and then power up the 7210 SAS-D. The system will start booting up with messages on the console similar to those shown below.
Page 54
Total Memory: 512MB Chassis Type: sas Card Type: badami_7210 TiMOS-L-3.0.B5-85 boot/mpc NOKIA SAS-D 6F4T 7210 Copyright (c) 2000-2011 Nokia. All rights reserved. All use subject to applicable license agreements. Built on Wed Apr 20 14:13:38 IST 2011 by builder in /builder/3.0B5/panos/main...
Page 55
115200 Do you want to overwrite cf1:/bof.cfg with the new settings? (yes/no): Type yes and press Enter. The 7210 SAS-D should boot now. Primary image location: cf1:/both.tim Loading image cf1:/both.tim Version B-3.0.B5-85, Wed Apr 20 14:32:04 IST 2011 by builder in /builder/3.0B5/panos/ main text:(25059814-->122242456) + data:(3179598-->18748616)
You can use one of the front panel ports (referred to as uplinkA and uplinkB in the display output shown below) to boot the 7210 SAS-D from the network. The example below shows how to boot the device with the out-of-band management port and without it using the manual boot process.
• A PC with a serial port and Hyperterminal • An RJ-45 serial cable that connects the console port of 7210 SAS-D to the serial port of PC • A network cable to connect the 7210 SAS-D to the network...
Page 58
Configuring the System 7210 SAS-D CHASSIS INSTALLATION GUIDE uplinkB-vlan #System Settings: wait persist console-speed 115200 Hit a key within 2 seconds to change boot parameters... Press any key. Enter password to edit the Boot Options File Or CTRL-D to exit the prompt Password: The default password is password.
Page 59
7210 SAS-D CHASSIS INSTALLATION GUIDE Configuring the System Press ENTER, or type 'none' for no Config URL. Config File URL: If you are not booting for the first time, enter the location of the configuration file. Otherwise, type none. Boot Interface Management...
Page 60
#System Settings: wait persist console-speed 115200 Do you want to overwrite cf1:/bof.cfg with the new settings? (yes/no): Type yes and press Enter. The 7210 SAS-D should boot now. Primary image location: ftp://*:*@10.10.170.22/./images/both.tim 3HE 10087 AAAA TQZZA Edition 01 Issue: 08...
5.2.1.3 Downloading the TiMOS Software to the Internal Flash If you want to boot the 7210 SAS-D from the internal flash, you will have to copy the image to that location. If you have used the uplinkA or uplinkB port to boot the 7210 SAS-D, use any of the network ports for IP connectivity and follow the procedure given below to configure an IP interface and a route.
Page 62
Configuring the System 7210 SAS-D CHASSIS INSTALLATION GUIDE sap 1/1/10:0.* create exit exit no shutdown exit ---------------------------------------------- A:SN12>config>service# Configure a route to the FTP server. A:SN12#configure router A:SN12>config>router# A:SN12>config>router# static-route 10.10.170.0/10 next-hop 10.135.4.1 A:SN12>config>router# Check IP connectivity: A:SN12# ping 10.10.170.22 source 10.135.4.172 PING 10.10.170.22 56 data bytes...
Page 63
*A:SN12# bof save Writing BOF to cf1:/bof.cfg Saving BOF ..Completed. A:SN12# Reboot the 7210 SAS-D. The device will detect and use both the image and the configuration from the internal flash. Issue: 08 3HE 10087 AAAA TQZZA Edition 01...
• Telnet Connection, section 5.3.2 5.3.1 Console Connection The Console port on the front of the 7210 SAS-D is an RJ-45 connector. To establish a console connection, you need the following: • An ASCII terminal or a PC running terminal emulation software set to the parameters shown in the table below •...
The 7210 SAS-D must have a management IP interface configured with an IP address. Each 7210 SAS-D is limited to a total of seven inbound/outbound Telnet or SSH sessions to guarantee that either inbound or outbound sessions will be available.
7210 SAS-D CHASSIS INSTALLATION GUIDE 5.3.2.1 Running Telnet After the IP parameters are configured, you can access the 7210 SAS-D CLI with a Telnet connection. To establish a Telnet connection, run a Telnet program and issue the Telnet command, followed by the IP address.
Troubleshooting 7210 SAS-D CHASSIS INSTALLATION GUIDE 6.1 Diagnosing Switch Indicators This switch can be easily monitored through panel indicators to identify problems. Table 13 describes common problems you may encounter and possible solutions. Table 13 Troubleshooting Symptom Possible Cause Action...
7210 SAS-D CHASSIS INSTALLATION GUIDE Troubleshooting Table 13 Troubleshooting (Continued) Symptom Possible Cause Action Link LED is Off Network cable or Ethernet • Verify that the switch and attached device attached to this port device are powered on. may be defective.
Troubleshooting 7210 SAS-D CHASSIS INSTALLATION GUIDE 6.2 Power Problems If the power indicator does not turn on when the power cord is plugged in, you may have a problem with the power outlet, power cord, or internal power supply. However, if the unit powers off after running for a while, check for loose power connections or power loss or surging at the power source.
Specifications 7210 SAS-D CHASSIS INSTALLATION GUIDE 7.1.3 Safety Standards and Compliance Agency Certifications Table 16 Safety Standards and Compliance Agency Certifications Type Publication Safety CSA/NRTL (UL60950-1, CSA 22.2.No 60950-1) EN 60825-1 IEEE1613 Europe CE Mark: EN50081-1: EN55022 Class A ETSI EN 300 132-2 V2.2.2 (2007-10) ETSI EN 300 019-2-2V 2.1.2:1999-09, Class 2.3...
Page 75
7210 SAS-D CHASSIS INSTALLATION GUIDE Specifications Canadian Requirements Only This Class A digital apparatus meets all requirements of the Canadian Interference- Causing Equipment Regulations. Cet appareil numérique de la classe A respecte toutes les exigences du Réglement sur le matériel brouilleur du Canada.
Page 76
Use of Certain Hazardous Substances in Electrical and Electronic Equipment (RoHS2) Nokia has implemented a material/substance content management process. The process is described in: Nokia process for ensuring RoHS Compliance (1AA002660031ASZZA). This ensures compliance with the European Union Directive 2011/65/EU on the Restriction of the Use of Certain Hazardous Substances in Electrical and Electronic Equipment (RoHS2).
Console Connection 7210 SAS-D CHASSIS INSTALLATION GUIDE 8.1 Console Port Pin Assignments The RJ-45 serial port on the front panel is used to connect to the switch for out-of- band console configuration. The on-board configuration program can be accessed from a terminal or a PC running a terminal emulation program.
Console Connection 8.2 Configuring the Console Port for Alarm Input The 7210 SAS-D supports the ability to configure the Console port as an alarm input pin, allowing operators to monitor external events and alert the operator. The operating system triggers an alarm when it detects an open or closed circuit, and logs to an NMS system when an event is detected.
Page 80
Console Connection 7210 SAS-D CHASSIS INSTALLATION GUIDE Figure 23 Console Port Alarm Connection External Alarm Relays Refer to HW Install Guide Pin 1 Console for Minimum Cable Specification On Other Equipment Pin 2 RJ-45 and Maximum Allowed Cable Length. Alarm...
7210 SAS-D CHASSIS INSTALLATION GUIDE Installation Site Assessment 9 Installation Site Assessment Before installing equipment at a site, the characteristics of the site should be considered to determine whether they will adversely affect the reliability of the equipment. The following section discusses some of the site factors to consider prior to deploying equipment.
Installation Site Assessment 7210 SAS-D CHASSIS INSTALLATION GUIDE 9.2 Installation Site Type The site must provide the appropriate environment for the installed equipment. This usually involves controlling ingress of contaminants and ensuring that humidity remains as low as possible. Installations are typically in a hut, parking garage, room, or cabinet. Installation in data centers or telecom centers do not usually have high pollution levels but could still have high humidity levels.
7210 SAS-D CHASSIS INSTALLATION GUIDE Installation Site Assessment 9.2.2 Cabinet There are 3 major classifications of cabinets. • Direct Air Cooled (DAC) cabinets bring air into the cabinet to cool the equipment. DAC cabinets may or may not be filtered. Unfiltered air intake and exhaust is not recommended since issues will occur if unfiltered air is allowed into the cabinet.
Page 84
Installation Site Assessment 7210 SAS-D CHASSIS INSTALLATION GUIDE Many areas are prone to flooding during rainy season or spring thaws, and it is important for the site to be located above typically anticipated flood levels, or to have sump pumps to keep the installation site dry. Drainage with a back flow preventer should be installed if the site has provision for water sources, such as cooling towers.
7210 SAS-D CHASSIS INSTALLATION GUIDE Installation Site Assessment 9.4 Site Assessment Checklists The following site assessment checklists are intended to act as a tool in assessing the potential risks that must be managed at an installation site. The checklists are not intended to provide an exhaustive list of all risk factors, but rather to indicate some of the most common risks.
7210 SAS-D CHASSIS INSTALLATION GUIDE Installation Site Assessment 9.4.3 Specific Characteristics of the Installation Site Does the installation site exhibit characteristics that may require upgrade or repair? Table 20 Specific Characteristics of the Installation Site Characteristic Is the installation site in a room that is part of the building HVAC...
Customer Document and Product Support Customer documentation Customer Documentation Welcome Page Product manuals and documentation updates are available at Nokia.com. If you are a new user and require access to this service, please contact your Nokia sales representative. Technical Support...