Preparing The Emx0 Pcie3 Expansion Drawer For Operation After You Permanently Remove A Pcie3 6-Slot Fanout Module - IBM Power System PCIe3 Manual

6-slot fanout module for the emx0 pcie gen3 i/o expansion drawer
Table of Contents

Advertisement

Figure 22. Placing the cable management bracket in the lowered operating position
Preparing the EMX0 PCIe3 expansion drawer for operation after you
permanently remove a PCIe3 6-slot fanout module
To prepare the EMX0 PCIe3 expansion drawer for operation after you permanently remove a PCIe3 6-slot
fanout module, complete the steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Put the cable management bracket in the operating position. See Figure 23 on page 22.
a. Pull out the quarter-turn fasteners (B) and turn them to disengage them while moving the cable
management bracket (A) to its lower position.
b. Turn the quarter-turn fasteners (B) to engage and lock the bracket into position.
PCIe3 6-slot fanout module
21

Advertisement

Table of Contents
loading

Table of Contents