Required Tools and Equipment
To prevent the system from overheating, do not operate it in an area that exceeds the maximum
Warning
recommended ambient temperature of 149°F (65°C). Statement 1047
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special
Warning
precautions to ensure that the system remains stable. The following guidelines are provided to ensure
your safety:
• This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
• When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the
heaviest component at the bottom of the rack.
• If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing
the unit in the rack. Statement 1006
Complete the necessary rack mount task
Step 1
page 18-49.
Continue with the
Step 2
Stop. You have completed this procedure.
NTP-H169 Install the Cable Management Bracket
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Warning
The covers are an integral part of the safety design of the product. Do not operate the unit without the
covers installed. Statement 1077
Step 1
Line up the three screw holes on the rear of the bracket with the screw holes at the bottom of the
ONS 15310-MA SDH shelf assembly
Cisco ONS 15310-MA SDH Procedure Guide, R9.0
1-6
DLP-H248 Mount a Single ONS 15310-MA SDH in a Rack,
"NTP-H169 Install the Cable Management Bracket" procedure on page
This procedure describes how to install the cable management bracket,
which is used for routing optical and Ethernet cables.
#2 Phillips screwdriver
Standard cable management bracket and
three #8-32 x 0.31 inch (0.79 cm) screws (included with the ship kit)
or
Extended cable management bracket (15310-CBLMGT) and
five 8-32 x 0.31 inch (0.79 cm) screws
NTP-H150 Install the Shelf Assembly, page 1-5
Required
Onsite
None
(Figure
Chapter 1
1-1).
Install the Cisco ONS 15310-MA SDH
1-6.
78-18668-01