Page 1
I N S T A L L A T I O N I N S T R U C T I O N S Bolt-Down Stand Spanish Product Description German Product Description Portuguese Product Description Italian Product Description Dutch Product Description French Product Description OMNDBF46-55...
OMNDBF55. contingency in connection with the installation or use of this product. The information contained in this document is subject to change without notice or obligation of any kind. Legrand WARNING: Use this mounting system only for its intended makes no representation of warranty, expressed or implied, use as described in these instructions.
Page 3
Installation Instructions OMNDBF46-55 DIMENSIONS OMNDBF55 2178.05 85.8 2227.80 87.7 915.09 36.0 6.25 39.37 740.96 10.16 29.2 OMNDB46 2.75 69.9 1.90 48.3 REMOVABLE POST CAP FOR CABLE ACCESS 46" SAMSUNG OMN DISPLAY SHOWN NOT INCLUDED 80.2 2037.5 36.1 916.0 127.0 1.55 25.0 39.4 634.6...
Page 4
OMNDBF46-55 Installation Instructions LEGEND Tighten Fastener Pencil Mark Apretar elemento de fijación Marcar con lápiz Befestigungsteil festziehen Stiftmarkierung Apertar fixador Marcar com lápis Serrare il fissaggio Segno a matita Bevestiging vastdraaien Potloodmerkteken Serrez les fixations Marquage au crayon Loosen Fastener Drill Hole Aflojar elemento de fijación Perforar...
Installation Instructions OMNDBF46-55 TOOLS REQUIRED FOR INSTALLATION 1/2" (12.7mm) 25/64" (10mm) - concrete 7/32" (5.5mm) - wood 3/16" (concrete only) PARTS C (2) [Pipe cap] B (4) D (2) [Bolt hole cap] [Post cover] E (4) G (8) F (8) M8x20mm H (8) 5/16 x 2 1/2"...
OMNDBF46-55 Installation Instructions Assembly And Installation Using a 25/64" (10mm) (CONCRETE) or a 7/32" (5.5mm) (WOOD) drill bit, drill a hole 3 1/2” in depth at each marked location. (See Figure 3) and (See Figure 4) Slide two post covers (D) onto two floor posts (A). (See Figure 1) Blow each hole clean of any debris with a large air hose or compressed air in a can.
Installation Instructions OMNDBF46-55 Cable Management 10. Route cables as desired. See Cable Management Section for details. Route cables through floor posts (A) as desired. (See 11. Snap post covers (D) over floor post bases. (See Figure 5) Figure 7) (D) x 2 Figure 5 12.
Page 8
P +31 (0) 495 580 852 F +31 (0) 495 580 845 Asia Pacific A Office No. 918 on 9/F, Shatin Galleria 8800-003156 Rev02 18-24 Shan Mei Street 2019 Legrand Fotan, Shatin, Hong Kong www.legrandav.com P 852 2145 4099 11/19 F 852 2145 4477...
Need help?
Do you have a question about the CHIEF OMNDBF46-55 and is the answer not in the manual?
Questions and answers