Initial Commissioning; Switch On The Tumble Dryer - Miele PDR 908 HP Marine Operating And Installation Instructions

Heat-pump dryer
Table of Contents

Advertisement

Initial commissioning

Risk of injury or damage to prop-
erty due to improper installation.
Incorrect installation of the tumble
dryer can lead to personal injury or
damage to property.
Before commissioning the tumble
dryer for the first time, make sure it
has been installed and connected
correctly. See "Installation".
Damage caused by switching the
appliance on too soon.
This can damage the heat pump in
the tumble dryer.
After setting up the tumble dryer,
wait for at least one hour before
switching it on.
Follow all the steps required for initial
commissioning.
During the commissioning process,
you will need to define the settings for
daily use of the tumble dryer. Some of
the settings can only be configured
during the initial commissioning pro-
cess. After that, they must be changed
by Miele Service.
These settings are also described under
"Supervisor level".
24

Switch on the tumble dryer

 Press the  control.
The welcome screen will light up.
Setting the language
You will be asked to select the language
you require for the display. You can
change the language at any time (see
"Language" under "Supervisor level").
Language
deutsch
english (CA)
english (AU)
english (GB)
 Scroll to the left or the right until the
language you want appears.
 Touch the sensor for the language
you want.
The selected language will be high-
lighted in orange and the display will
change to the next setting.
english (US)
español
OK

Advertisement

Table of Contents
loading

Table of Contents