Water Requirements (Water-Cooled Units Only) - Ametek LAND LSP HD Series User Manual

Linescanner head
Table of Contents

Advertisement

User Guide
To reset the IP address back to 10.1.10.10x, press the laser button until the light goes
out, then immediately release the button.
3.1.3 Start-up time
The scanner will begin its start-up when connected to an appropriate power source.
The scanner takes approximately 2 minutes to boot, during which time it will not
operate.
3.2 Water Requirements (Water-Cooled Units Only)
If the LSP Linescanner Head is to be used in an environment where ambient
temperatures are above the maximum specified, the AMETEK Land Water Cooled Air
Purge mounting accessory must be used.
This mounting accessory requires a constant water supply. The special mounting plate
has internal water channels with inflow and outflow connections (G1/8 tappings) in the
plate edge.
There is no preferred flow orientation. However, if the scanner is mounted in a position
where one of the water connectors is higher than the other, then the lower connector
must be used for the mains water in-flow.
The Water Cooled Mounting Plate is supplied fitted with hose connectors suitable for
9.5mm / 3/8in bore water hose. The water flow rate required will depend upon each
individual application, but 1 litre per minute / 0.26 US gallons per minute is an absolute
minimum, with a maximum water temperature of 30 °C / 86 °F.
The maximum water pressure is 586 kPa / 85 psi.
CAUTION
If the scanner is over-cooled to below the local dewpoint, condensation will form
on the unit. This situation must always be avoided.
The temperature of the cooling water must be in the range of 15 to 30 °C / 59
to 86 °F.
A constant supply of clean water is recommended, as this reduces the likelihood
of blockages within the mounting plate.
LSP
Linescanner Head
HD
Page 17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents