Stand-Alone Gateway Installation Checklist - IBM System Storage TS7600 ProtecTIER Series Installation Roadmap Manual

Hide thumbs Also See for System Storage TS7600 ProtecTIER Series:
Table of Contents

Advertisement

Stand-alone gateway installation checklist

About this task
The checklist below outlines the tasks required to successfully install the hardware
in a stand-alone gateway configuration. If you are installing a clustered gateway,
use the "Clustered gateway installation checklist" on page 18.
Important:
This document references IBM DS4700 disk controllers (1814 70H) and IBM EXP810
disk expansion modules (1812 81H) in many of the hardware installation figures,
examples, and procedures.
In addition to the IBM DS4700 disk controller, the TS7650G also supports the
DS5000 disk controller and the XIV disk controller. If the customer has elected to
use disk storage components other than the IBM DS4700 disk controllers (1814
70H) mentioned above, the figures, examples, and procedures in this document
will not apply to the configuration on which you are working. Therefore, it is
suggested that you determine the make and model of the disk storage components
in use and, if necessary, obtain the related product documentation before you begin
installation of the gateway.
The RAS code no longer sends call home packages for problems with any of the
disk storage products attached to the gateway including DS4700, DS5000, and XIV.
Table 4. Stand-alone gateway installation checklist
Task
Description
U
Section 1: Perform preinstallation verification
1–1
The disk components are installed in suitable
h
frames.
1–2
The frames are in a suitable location.
h
1–3
The disk controllers are located within 25m (82
h
ft.) cable length of the server(s).
1–4
All RAID, logical drive, and LUN
h
configuration is completed.
1–5
Two IP addresses were assigned for use: One
h
for the 3958-DD3 server and one for the TSSC.
1–6
One or more PCs on the customer's local area
h
network (LAN) have been designated as
ProtecTIER Manager workstations.
1–7
A separate USB keyboard and graphics-capable
h
monitor have been provided for use during
installation.
1–8
If applicable, ensure that replication
h
configuration efforts are being coordinated
between the source and destination sites.
Section 2: Install the gateway components
16
IBM System Storage TS7600 with ProtecTIER: Installation Roadmap Guide
Where to find information
If this task was not completed prior to your
arrival, refer to "Read this first" on page 11
and "Disk storage configuration guidelines" on
page 11.
N/A
N/A
Customer
If these tasks were not completed prior to your
arrival, refer to "Read this first" on page 11
and "Disk storage configuration guidelines" on
page 11.
Customer
Customer
Customer
Customer, LBS, and or trained ProtecTIER
specialist.

Advertisement

Table of Contents
loading

This manual is also suitable for:

System storage ts7650g protectier

Table of Contents