Testing The 96Am Wash Station - Agilent Technologies AssayMAP 96AM Maintenance Manual

Wash station
Table of Contents

Advertisement

1 96AM Wash Station Maintenance Guide

Testing the 96AM Wash Station

Testing the 96AM Wash Station
Before you start
Starting up the AssayMAP Bravo Platform
Troubleshooting problems with the wash station
16
CAUTION
Any time that you uninstall and reinstall the wash station, the wash station
teachpoint can shift. To prevent a potential crash, verify the wash station teachpoint in all the
profiles any time you reinstall the wash station.
For the teachpoint verification workflow, see
workflow" on page
4.
To test the performance of the wash station, you run the Startup utility in the
Protein Sample Prep Workbench. During the Startup protocol, carefully observe
the fluid as it flows out of the top of the chimneys in the wash station. If all
the chimneys are flowing evenly, the device is ready for operation.
To start up the system:
1
Check the levels of the wash station source and waste carboys, and fill or
empty as required.
2
Turn on the AssayMAP Bravo Platform, Pump Module, and the Peltier
Thermal Station Controller, if included.
3
Start the Protein Sample Preparation Workbench, and open the Utility Library.
4
Open the System Startup/Shutdown utility
5
Click Run Startup to initialize the AssayMAP Bravo Platform and accessories.
WARNING
When you initialize the Bravo Platform, the head and tie bar can move.
To prevent injury, keep clear of the device while it is in motion.
6
During the Startup protocol, verify that all the wash station chimneys have
liquid flowing through them.
Locate your problem in the following table and try the solution. If the problem
persists after you try the solutions, contact Automation Solutions Technical
Support.
"Required resources and
.
AssayMAP 96AM Wash Station Maintenance Guide

Advertisement

Table of Contents
loading

Table of Contents