Commissioning; Connection; Device Settings - Pepperl+Fuchs IC-KP-R2-V1 Manual

Identcontrol interface with serial interface
Table of Contents

Advertisement

IC-KP-R2-V1

Commissioning

6
Commissioning
6.1
Commissioning
6.1.1

Connection

Warning!
Before commissioning, check once again that the connections are correct.
After the supply voltage is connected, the green LED in the voltage connector and the PWR
and UL LEDs on the display panel must light up. If the LED in the connector lights up red, the
polarity of the power supply is reversed.
6.1.2

Device settings

Warning!
Device not configured or configured incorrectly
Configure the device prior to commissioning. A device that has not been configured or
configured incorrectly may lead to faults in the plant.
You must set the various parameters prior to commissioning.
The parameters are volatile and non-volatile parameters. Volatile parameters are reset to their
default setting when the system is switched off and on again.
Non-volatile parameters
Parameter
General
LCD contrast
LCD light
Language
Multiplex mode
R/W head
Trigger mode
Tag type
RS 232 interface
Baud rate
Timeout
Volatile parameters
Parameter
R/W head
Password mode
Password
Configure the read/write station with the described system commands. "99" is preset as the tag
type.
18
Default setting
50
On
English
off
off
99
9600
0
Default setting
Off
00000000
Value range
36 ... 71
On / off
English / German
On / off
On / off
00 ... FF
1200, 2400, 4800, 9600,
19200, 38400
0 ... 100
Value range
on / off
00000000 ... FFFFFFFF

Advertisement

Table of Contents
loading

Table of Contents