10.5 Commissioning Measuring Cycles For Hmi-Embedded Pcu20 Powerline; Requirements; Step 1 - Load Definition Files; Step 2 - Load Cycle Programs - Siemens SINUMERIK 840D sl Programming Manual

Measuring cycles
Hide thumbs Also See for SINUMERIK 840D sl:
Table of Contents

Advertisement

10.5
Commissioning measuring cycles for HMI-Embedded PCU20
10.5
powerline
10.5.1

Requirements

• Successful execution of steps 0.1 and 0.2 from chapters 10.2.2 and 10.2.3.
• As of V06.03.30 of HMI-Embedded, the measuring cycles are integrated in the software.
• Only the following steps 1 to 5 are needed for further commissioning.
10.5.2
Step 1 – load definition files
• Transfer GUD5.DEF and GUD6.DEF from the subdirectory "define" to the NCU using
• Select blocks singly and press softkey "Activate".
10.5.3
Step 2 – load cycle programs
• Load SPF files for the cycles into NCU from the directory "cycles" (or individual cycles
• Run NC reset to update the cycle interface
10.5.4
Step 3 – set measuring cycle data
• Check default values of the GUD variables and set other values, if necessary.
• That is done by selecting and changing the variables in "Parameters", "User data" ... .
10.5.5
Step 4 – menu tree for extending measuring cycles
• Adjust file common.com and then load the following file in NCU:
• Then load the file in the NCU and perform an NC reset.
Measuring cycles
Programming Manual, Release 04/2006, 6FC5398-4BP10-0BA0

10.5 Commissioning measuring cycles for HMI-Embedded PCU20 powerline

"Services", "Data in" (e.g. using V.24 or floppy disk).
from the directory \cycles\spf_file).
Data description (see Section 9.2 "Cycle data" and up-to-date information in
SIEMENSD.TXT / SIEMENSE.TXT included with the software delivered).
– hmi_emb\mcsupp\common.com
– Adaptation: Remove semicolon in front of SC617, SC326, and SC327
Start-up (hardware)
10-15