Operation; Operation And Setting; Preliminary Operation - B-I Inductrial BI-SM2004 Manual

Smoke density indicator
Table of Contents

Advertisement

B-I INDUSTRIAL CO., LTD.
CHAPTER 2

2-1 OPERATION AND SETTING

2-1-1 Preliminary Operation

a. Check the connection of terminal block, ect inside control panel
b. Check the power connection AC110/220V and PCB socket status according to the
POWER AC110/220V
c. If all connection is setup properly, please power on and check the monitor
d. After booting complection, Indication will be displayed accroding to stack status
e. If necessary, carry out Calibration. Refer to 13 page, setup Zero & Span(chapter 2 on)
our manual

2-1-2 Operation

Power On
Switch the power on at the ac inlet. The FMD on the front panel illuminates, it remains
illuminated while the ac power is connected to the unit and switched on. The Smoke Density
Indicator enters its warm-up, this takes approximately 60 seconds to complete. During
warm-up the following screens appear on the display.
BI-SM2004.doc
START WARM-UP
DISPLAY THE SOFTWARE VERSION
CHECKING SMOKE SENSOR
COMPLETED WARM-UP AND NORMAL OPERATING
DISPLAY
SMOKE DENSITY INDICATOR
9/34