Installing The Solar Pump Station; Layout Of The Installation Space; Mounting The Solar Pump Station; Electrical Connection - Bosch Worcester AGS 5 Installation And Servicing Instructions

Solar pump stations, for sealed solar heating systems and indirect fed domestic hot water
Table of Contents

Advertisement

INSTALLING THE SOLAR PUMP STATION

5
INSTALLING THE SOLAR PUMP STATION
5.1
LAYOUT OF THE INSTALLATION
SPACE
CAUTION: Damage to the solar heating
station from pump buildup
B Make sure that the ventilation slots, at
the top and bottom of the thermal-
protective casing, are open.
B To make it easier to connect the temperature sensors:
install the solar pump station (2) as close as possible
to the solar storage tank (1).
B Allow enough room for an expansion vessel (3) and
storage vessel (4).
7747006489.07.1.SD
Fig. 6
Recommended positioning
(measurements in mm)
1
Solar storage tank
2
Solar pump station
3
Expansion vessel
4
Storage vessel
10
5.2
MOUNTING THE SOLAR PUMP
STATION
1-LINE SOLAR PUMP STATION
B Drill a hole (2) and mount the solar pump station
using the wall plug and screw supplied.
2-LINE SOLAR PUMP STATION
B Drill holes (1) 60 mm apart and mount the solar pump
station using the wall plugs and screws supplied.
2
10 mm
10 mm
8 mm
Fig. 7
Mounting the station
1
Mounting for 2-line solar pump station
2
Mounting for 1-line solar pump station
5.3

ELECTRICAL CONNECTION

Electrical connections must be carried out by properly
authorised electricians and subject to locally applicable
regulations.
CAUTION: Damage to pump
B Do not put the pump into operation until
the pipework has been filled. Otherwise
the pump can be damaged.
B Connect the cables for the pumps and temperature
sensors to the controller as directed by the
installation instructions for the controller.
6 720 643 603 (2011/11)
60 mm
7747006489.08-1.SD
7747006489.08-1.SD

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Worcester ags 5eWorcester ags 10Worcester ags 10e

Table of Contents