molex Shielded DataGate Installation Instructions Manual

Advertisement

INSTALLATION INSTRUCTIONS
Terminated with F/UTP cable .............................................................................................page 1-3
Terminated with S/FTP cable .............................................................................................page 4-5
Terminated with U/FTP cable .............................................................................................page 6-8
1.

Termination Tool

110 termination tool set on low impact.
TERMINATED WITH F/UTP CABLE
2.
2a.
Slide rear can and plastic cable clamp on to cable.
2b.
180° cable entry.
2c.
90° cable entry.
2d.
Remove can cut-out for 90° cable entry.
Molex Premise Networks
Corporate Headquarters
Tel: 1 866 733 6659
www.molexpn.com
Doc. # AS-18700-002, Rev C
MOLEX PREMISE NETWORKS
European
Headquarters
Tel: 44 (0) 1489 572111
www.molexpn.co.uk
Form # 315-234
This information is correct as at the time of publication, specifications are subject to change.
Shielded DataGate Jack
Pac Rim
Headquarters
Tel: 61 3 9971 7111
www.molexpn.com.au
Rev. Date: July 2008
Molex
Incorporated
Tel: 630 969 4550
www.molex.com
SAP # 187000294
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Shielded DataGate and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for molex Shielded DataGate

  • Page 1 Shielded DataGate Jack INSTALLATION INSTRUCTIONS Terminated with F/UTP cable .....................page 1-3 Terminated with S/FTP cable .....................page 4-5 Terminated with U/FTP cable .....................page 6-8 Termination Tool 110 termination tool set on low impact. TERMINATED WITH F/UTP CABLE Preparation and termination (F/UTP) Slide rear can and plastic cable clamp on to cable.
  • Page 2 Shielded DataGate Jack INSTALLATION INSTRUCTIONS Remove 100mm of cable sheath. Cut central separator back to sheath. 100mm Cut cellophane wrap back to sheath. Wrap foil around cable. Untwist - Max 6mm Wrap foil around cable Wrap drain wire around foil and tighten, leaving a length of drain wire available for wrapping around rear can cable clamp.
  • Page 3 Shielded DataGate Jack INSTALLATION INSTRUCTIONS Ensure cables are trimmed off flush with IDC, if not use side cutters to remove excess cable after termination. Fitting Can and Securing Cable (F/UTP) Slide the rear can over the front can. Ensure that the two halves are latched together securely.
  • Page 4 Shielded DataGate Jack INSTALLATION INSTRUCTIONS TERMINATED WITH S/FTP CABLE Preparation and termination (S/FTP) Slide plastic cable clamp and rear can on to cable. Remove 100mm of cable sheath. Remove foil from pairs of cable. Twist braid and wrap around the cable sheath Wiring Map.
  • Page 5 Shielded DataGate Jack INSTALLATION INSTRUCTIONS Fit stuffer cap after termination. Fiting Can and Securing Cable (S/FTP) Slide the rear can over the front can. Ensure that the two halves are latched together securely. Wrap braid around the metal cable collar to maintain shield continuity.
  • Page 6 Shielded DataGate Jack INSTALLATION INSTRUCTIONS TERMINATED WITH U/FTP CABLE Preparation and termination (U/FTP) Slide plastic cable clamp and rear can on to cable. Remove 100mm of cable sheath. Remove 3 of the 4 foils from the cable pairs. Unwrap the foil from 1 pair in preparation for wrapping around the cable sheath.
  • Page 7 Shielded DataGate Jack INSTALLATION INSTRUCTIONS Wrap drain wire around foil and tighten, leaving a length of drain wire available for wrapping around rear can cable clamp. Wiring Map. Terminate the jack before inserting it in front can. Ensure that the cable sheath is maintained up to the connector.
  • Page 8 Shielded DataGate Jack INSTALLATION INSTRUCTIONS Fitting Can and Securing Cable (U/FTP) Slide the rear can over the front can. Ensure that the two halves are latched together securely. Ensure that sufficient foil and drain wire makes contact with rear metal collar.

Table of Contents