Battery Installation - Honeywell Vigilon 4 loop Generic Commissioning Instructions

Fire panels & network nodes
Table of Contents

Advertisement

Battery Installation

¨
A battery lead supplied in the spares pack must be fitted to the Power supply board,
connector P7 labelled BAT1. The next step is to install the batteries inside the
enclosure, which requires removal of battery brackets from the backbox and then
installation of the batteries in correct orientation, standing on the small side with
terminals at the top facing outwards. Secure the batteries by refitting the battery
brackets.
¨
Switch On the mains supply to the panel and then make the connections to the battery.
Panel with doors open
Battery brackets
secured with two screws
4188-856_issue 7_07/15_Generic Vigilon (Compact + VA) Comms.
Battery lead connects
to PSU board P2 Bat1
PSU
Battery brackets
secured with two nuts
Vigilon 4/6 loops & Compact (VA) panels & network nodes
"
The panel makes use of sealed lead acid type batteries which can have a
useful life of 5 years or more from the date of manufacture. It is strongly recommended
that batteries are replaced after 4 years of use.
recommendation made by the battery manufacturer and in accordance with local regulations.
&
Always use the recommended replacement battery, as there is a risk of
an explosion if incorrect batteries are used.
PANEL
P3
43V
FS6
1A P7
BAT1
-
Black
- +
- +
All batteries must be disposed of as per
PSU BOARD
Y1 Y2 G1
+
Red
2 - 12V 12Ah battery
49