Equipment Required; Overview Of Startup Procedure; Table 1-1. Startup Overview - Motorola MVME2700 Series Installation And Use Manual

Hide thumbs Also See for MVME2700 Series:
Table of Contents

Advertisement

Equipment Required

The following equipment is required to complete an MVME2700 system:
MVME2700 VME modules are factory-configured for I/O handling via
either MVME712M or MVME761 transition modules.

Overview of Startup Procedure

The following table lists the things you will need to do before you can use
this board and tells where to find the information you need to perform each
step. Be sure to read this entire chapter, including all Caution and Warning
notes, before you begin.
What you need to do...
Unpack the hardware.
Configure the hardware by
setting jumpers on the boards
and transition modules.
Ensure that mezzanine boards
are properly installed.
Install the MVME2700 VME
module in the chassis.
http://www.motorola.com/computer/literature
VME system enclosure
System console terminal
Operating system (and/or application software)
Disk drives (and/or other I/O) and controllers
Transition module (MVME712M or MVME761) and connecting
cables

Table 1-1. Startup Overview

Unpacking Instructions on page 1-5
MVME2700 Base Board Preparation on page 1-6
and
on page 1-12
Preparation on page 1-23
Hardware Installation on page
Memory Mezzanine; PMC Module; PMC Carrier
Board
MVME2700 VME Module Installation on page 1-53
Refer to...
MVME712M Transition Module Preparation
or
MVME761 Transition Module
Equipment Required
1-46, RAM200
1-3
1

Advertisement

Table of Contents
loading

Table of Contents