Equipment Required
The following equipment is required to complete an MVME2700 system:
MVME2700 VME modules are factory-configured for I/O handling via
either MVME712M or MVME761 transition modules.
Overview of Startup Procedure
The following table lists the things you will need to do before you can use
this board and tells where to find the information you need to perform each
step. Be sure to read this entire chapter, including all Caution and Warning
notes, before you begin.
What you need to do...
Unpack the hardware.
Configure the hardware by
setting jumpers on the boards
and transition modules.
Ensure that mezzanine boards
are properly installed.
Install the MVME2700 VME
module in the chassis.
http://www.motorola.com/computer/literature
VME system enclosure
System console terminal
Operating system (and/or application software)
Disk drives (and/or other I/O) and controllers
Transition module (MVME712M or MVME761) and connecting
cables
Table 1-1. Startup Overview
Unpacking Instructions on page 1-5
MVME2700 Base Board Preparation on page 1-6
and
on page 1-12
Preparation on page 1-23
Hardware Installation on page
Memory Mezzanine; PMC Module; PMC Carrier
Board
MVME2700 VME Module Installation on page 1-53
Refer to...
MVME712M Transition Module Preparation
or
MVME761 Transition Module
Equipment Required
1-46, RAM200
1-3
1