Assembly; Subsequent Assembly On The Tc 2013 - ABB TSC 2013 Assembly Instructions Manual

Torch service center
Table of Contents

Advertisement

Assembly

4.7
Assembly
4.7.1

Subsequent assembly on the TC 2013

The TCP gauging can be retrofitted on the TC 2013 at any time.
1. It should be verified before starting
assembly that the protective sleeve (3)
is in position on the adjusting tip! (5) . If
not, put the protective sleeve on (danger
of piercing).
2.
Place the TCP gauging unit on the TC 2013
so that the two pins (4) rest in the holes pro-
vided (2).
3.
Then secure with 1 screw M6x12 (1)
4.
Then attach the two pins (4).
4-8
Before assembly and installation work the system
must be electrically dead and pressureless and pro-
tected against being switched back on.
The electrical connection of the TCP gauging is to be
correct out as shown in the connection diagram.
3HDA000057A8519-001
WARNING
1
2
4
CAUTION
2
1
3
5
4
TCP gauging (BullsEye
®
)

Advertisement

Table of Contents
loading

Table of Contents