Resetting The Load Control Signals; Use On The Lpb; Resolution Of M-Bus Signals - Siemens RVD240 Basic Documentation

District heating and domestic hot water controller
Table of Contents

Advertisement

Caution
Siemens Building Technologies
HVAC Products
The validity of the demand for heat will not be influenced. The compensating variable
will not be influenced either since load management is a short-term intervention.

23.5.3 Resetting the load control signals

The controller clears all load control commands 2 hours after their activation if they
have not already been reset via M-bus. In general, a load control command will not be
reset when a setpoint is reached; this means that the command is not only executed
once, but is valid during the entire duration of the intervention.

23.5.4 Use on the LPB

On operating line 154, it is possible to define whether the load control signals received
via M-bus shall be used only locally or, additionally, shall be passed on via LPB in the
segment or in the entire interconnected system.
The numbers on the display have the following meaning:
Input
Use
0
Only locally
1
In the same LPB segment
2
In the entire LPB system
• When the signals are delivered in the LPB segment, no other device in that segment
may be connected to the M-bus!
• When the signals are delivered throughout the LPB system, no other device in the
entire LPB system may be connected to the M-bus!

23.5.5 Resolution of M-bus signals

Signal
Water temperatures
Air temperatures
Voltage at DC 0...10 V input
Basic documentation RVD240
23 Function block M-bus parameter
Resolution
1.0 °C
0.1 °C
0.1 V
85/126
CE1P2384en
27.05.2004

Advertisement

Table of Contents
loading

Table of Contents