Rep10.9 - Xerox 3050 Service Manual

Table of Contents

Advertisement

(Continued)
Replacement
9. (Figure 5): Install the Developer material
and record the batch number on the
machine log.
Q
STEP 9A: Pour the developer material
evenly over the full length o f the two
augers.
EVENLY END-TO -END
Figure 5. Install the Developer
0
STEP 1
0 and D: The gears must be
reinstalled with the flanges as shown to
ensure that aN the gears are secured.
PRESSURE
. ; . .
EQUALIZER TUBE
INSTALL THE
I
.-
1.
(Figure
6):
Reinstall the Pressure Equalizer
Tubes.
INSTALL THE
PRESSURE EQUALIZER
E
%
1
TTAtNE
INSTALL THE
PRESSURE
GEAR AND THE
EQUALIZER TUBE
Figure 6. Reinstall the Air Equalization Tubes
I
.
(Continued)
3/93
3050
4-83
REP 9.7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents