Honeywell Spyder 5 User Manual page 36

Engineering tool
Hide thumbs Also See for Spyder 5:
Table of Contents

Advertisement

SPYDER MODEL 5 ENGINEERING TOOL – USER GUIDE
An application in the project can be either synchronous or not synchronous with the application running in the
connected controller.
As soon as non-synchronicity is detected, notification messages about the synchronization status are displayed.
NOTE: Software always give support by displaying appropriate messages which describe the current status/problem
and how to proceed.
WARNING!
It is strongly recommended to read and note any messages in order to avoid derived misleading actions afterwards
which may result in the deletion or loss of application data.
To solve any inconsistencies, synchronize the applications by doing any of the following:
Clear project
Clear controller
Teach to controller
Learn from controller
Checking Hardware Compatibility
For detailed descriptions, please refer to the corresponding sections:
Clearing Project, p. 85
31-00282ES-01
36

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents