Duke FLM200 Installation And Operation Manual
Duke FLM200 Installation And Operation Manual

Duke FLM200 Installation And Operation Manual

Front line merchandiser

Advertisement

Front Line Merchandiser
Models:
FLM200
CAUTION:
Please read this manual completely before attempting
to install, operate or service this equipment
This manual is Copyright © 2019 Duke Manufacturing Co. All rights reserved.
Reproduction without written permission is prohibited. Duke is a registered
trademark of the Duke Manufacturing Co.
Installation and
Operation Manual
REV A 07/11/2019
P/N 529061

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FLM200 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Duke FLM200

  • Page 1 CAUTION: Please read this manual completely before attempting to install, operate or service this equipment This manual is Copyright © 2019 Duke Manufacturing Co. All rights reserved. Reproduction without written permission is prohibited. Duke is a registered P/N 529061 trademark of the Duke Manufacturing Co.
  • Page 2: Table Of Contents

    Installation and Operation of: Front Line Merchandiser TABLE OF CONTENTS Important Safety Instructions ......................2-3 Specifications ............................4 Tools Required............................4 Unpacking Unit ............................5 End Glass Removal ..........................5 Installation ............................. 6 Maintenance ............................8 IMPORTANT SAFETY INSTRUCTIONS Throughout this manual, you will find the following safety words and symbols that signify important safety issues with regards to operating or maintaining the equipment.
  • Page 3 • Do not operate this equipment if it has a damaged cord or plug, if it is not working properly, or if it has been damaged or dropped. • This equipment shall be serviced by qualified personnel only. Contact the nearest Duke authorized service facility for adjustment or repair.
  • Page 4: Specifications

    Installation and Operation of: Front Line Merchandiser Specifications 30.63 28.63 23.88 57.38 = ADA 59.38 = STD 33.75 =ADA 35.75 =STD 5.88 No electrical requirements Tools Required Adjustable Pliers Level 7/16 Wrench Phillips Screw Driver...
  • Page 5: Unpacking Unit

    Installation and Operation of: Front Line Merchandiser UNPACKING UNIT UNPACKING UNIT Inspect the shipping carton and/or container, carefully noting any exterior damage on the delivery receipt; also note any damage not evident on the outside of the shipping container (concealed damage).
  • Page 6: Installation

    Installation and Operation of: Front Line Merchandiser Installation Step 1 Step 4 Remove the stainless steel cap from the side of Level Unit. To ensure the door of this unit seals the bread cabinet that will be installed next to completely, the unit must be fully leveled in all an adjacent unit (ex.
  • Page 7 Installation and Operation of: Front Line Merchandiser Installation - continued Step 8 Step 5 Install wire baskets into unit. Once unit is level, tighten bolts connecting bread display and adjacent unit. Step 9 Follow the décor panel instructions after the entire Step 6 lineup is installed and leveled.
  • Page 8: Maintenance

    WD-40, to wipe affected stainless steel. Domestic stainless steel cleaners containing calcium carbonate or citric acid, such as Citisurf 77 Plus, can also be used. Rinse thoroughly with clean water. Duke Manufacturing Co. Phone: 314-231-1130 Toll Free: 1-800-735-3853 2305 N.

Table of Contents