Index
performance verification test, 108–114
ping command, 104–105
POL light, 101
port number, 24
power cord, 14
power failure during firmware update, 98
probe, testing, 112
progflash, 92
R
RESET light, 101
RS-232
See serial connection
S
serial connection
DCE or DTE selection, 107
setting up, 34
verifying, 37
service ports, TCP, 24
software updates, 93
specifications
clock, 79–88
data communications, 79
humidity, 89
temperature, 89
trigger in/out, 79
StarLAN, 21
status lights, 101–102
subnet mask, 21, 104–106
switches
bootp, 30
serial configuration, 35
T
target system
connecting to, 40
telnet, 33, 103
temperature specifications, 89
terminal interface, 33
LAN parameters, setting, 23–25
ThickLAN, 21
ThinLAN, 21, 79
trigger
in/out specifications, 79
turning on power, 16
TX light, 101
Index-2
U
update
firmware, procedure, 96–97
update, firmware, 92
USER light, 101–102
V
version, firmware, 98
voltage
processor, 61
W
workstation files, 94