Installing On The S7-1500 Standard Rail - Siemens SIMATIC NET SCALANCE S615 Operating Instructions Manual

Industrial ethernet security
Hide thumbs Also See for SIMATIC NET SCALANCE S615:
Table of Contents

Advertisement

3.6

Installing on the S7-1500 standard rail

Installation
1. Place the first housing guide of the device on the top edge of the standard rail
2. Using a screwdriver, pull down the catch
3. Swing the device down while pulling down the catch
catch locks in place.
4. Connect the power supply, refer to the section "Power supply (Page 39)".
5. Fit the connectors for the digital input and digital output, refer to the section "Digital
input/output (Page 42)".
6. Connect the device to the local network, refer to the section "Ethernet port (Page 45)".
7. Connect the terminal with as short a cable as possible ≤ 150 mm and a large cross-
sectional area of 1.5 mm² to the functional ground of the system, see section "Terminals
(Page 18)" and section "Grounding (Page 41)".
Dismantling
1. Disconnect all connected cables.
2. Using a screwdriver, pull down the catch on the rear of the device.
3. Remove the device from the standard rail.
SCALANCE S615
Operating Instructions, 08/2018, C79000-G8976-C389-04
3.6 Installing on the S7-1500 standard rail
on the rear of the device.
. After it is released, the spring
Installation
.
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents