NEC Express 5800 Series Installation Manual page 34

Hide thumbs Also See for Express 5800 Series:
Table of Contents

Advertisement

Chapter 1 Installing OS
4. Press the POWER switch on front panel to start the system from the CPU/IO module 1, and perform
Steps 1-1 to 1-14 in similar way.
5. After configuring the settings for the CPU/IO module 1, set the CPU/IO module 0 as primary.
Press the POWER switch on front panel to turn off the server.
Then, disconnect all the power cords from the server.
6. Connect power cords in the following order to start the system from CPU/IO module 0.
(1) Connect a power cord to AC inlet connector A.
(2) Connect a power cord to AC inlet connector B.
34
Note
If you disconnect power cord (AC cable) and connect it again, wait for at least 30 seconds
before pressing the POWER switch (DC) to power on. Make sure that Module POWER
LEDs on both CPU/IO modules 0 and 1 are blinking, then press the POWER switch..
Note
Make sure that System POWER LED is unlit before disconnecting the power cord.
Important
Make sure that the PRIMARY LED on CPU/IO module 0 is lit.
Note
If you disconnect a power cord, wait for at least 30 seconds before connecting it again.
See Chapter 1 (1.2 Preparations for Setup) for AC inlet connector.
Tips
Express5800/R320d-E4, R320d-M4 Installation Guide (VMware 5.5)
1. Setup Procedure

Advertisement

Table of Contents
loading

Table of Contents