(Fig. 1-4). supplement any operational and safety training. Contact your Vacuworx representative for additional training information. ATTACHING TO HOST MACHINE Connect the host machine to the mounting assembly (Fig.
Cm series Operation Once the gauge reaches zero the pad can be removed MANUAL CONTROL OPERATION from the object it was lifting. Start in the OFF position (Fig. 1-6). Turn the switch back to the OFF position. WIRELESS REMOTE CONTROL OPERATION Fig.
Page 4
Operation Cm series STORING THE LIFTER To release vacuum, lower the load to the ground, hold blue button and press top green button (Fig. 1-9, 4) for Reposition legs to storage position. 1-2 seconds. The CM 3/SL 2 will continue to release the Disconnect the controller and hydraulic quick connects.
Page 5
Cm series modular pad system MODULAR PAD SYSTEM CHANGING PAD BEAM Slide the beam out of the way and put the other one in its place (Fig. 3-4). Position legs to the storage position and lower the CM 3 to the ground (Fig. 3-1).
Page 6
Modular PAD system cm series 11. Reinsert the pins to connect the beam to the lifter and 15. Insert pins to connect the pad to center of beam and install lynch pins to secure (Fig. 3-7). install lynch pins to secure (Fig. 3-10).
Page 7
Modular PAD system 20. Position pads evenly apart from the center of the beam to desired distance (lining up the holes from pads to beam). 21. Insert pins connecting pads to beam and install lynch pins to secure (Fig. 3-10).
Need help?
Do you have a question about the CM Series and is the answer not in the manual?
Questions and answers