E15-3S2
Installation space
Keep the space necessary for installation and service.
REQUIREMENT
The Access Area should be î LQ (600 × 600 mm).
Electrical box
Access Area
Installation under atmosphere of the high humidity
Although it has been confirmed that no trouble occurs on the unit, there is a fear of drip of the water if operation
under high humidity condition continues.
In some cases including the rainy season, especially inside of the ceiling may become high-humidity atmosphere
(dew-point temperature: 86 °F (30 °C) (humidity: 80%) or higher).
1
Installation to inside of the ceiling with tiles on the roof.
2
Installation to inside of the ceiling with slated roof.
3
Installation to inside of the ceiling with kitchen.
In the above cases, additionally attach the heat insulator (Glass wool, etc.) to all positions of the air
conditioner, which come to contact with the high-humidity atmosphere.
In this case, arrange the side plate (Service panel) so that it is easily removed.
Apply also heat insulating a sufficient thickness 0.39" LQ (10 mm) or more to the duct and connecting part of
the duct.
7.9" (200) or more
7.9" (200)
23.6"
39.4" (1000) or more
(600)
23.6" (600)
Duct
2.0" (50)
or more
3.9" (100) or more
Service panel
14
MMD-AP___1HF2UL
Unit: in (mm)
Access Area