12.2 Transfer sequence
12.2.5

Transfer sequence for application O: 2S - NPL

If Source 1 is regarded as the priority source, a transfer to the alternative source (Source 2)
takes place and an automatic return to the priority source according to the diagram below:
234
3KC ATC6500 transfer control device
Manual, 05/2019, L1V30538268002A-01