Transfer Sequence For Application C: 2S - 1T - Si - Siemens SENTRON ATC6500 Manual

Transfer switching equipment and load transfer switches 3kc transfer control device
Table of Contents

Advertisement

See also
Application B: 2S - 1T - PL (Page 22)
Parameters (Page 160)
12.2.3

Transfer sequence for application C: 2S - 1T - SI

In this case the priority of the sources is unimportant. Transfer takes place in the following
sequence:
3KC ATC6500 transfer control device
Manual, 05/2019, L1V30538268002A-01
Transfer
12.2 Transfer sequence
231

Advertisement

Table of Contents
loading

Table of Contents