Procedure For Connecting The Power Cable (C1 Connection) - NEC NP-02HD Installation Manual

Dlp cinema projector head/light module
Hide thumbs Also See for NP-02HD:
Table of Contents

Advertisement

2-5-2. Procedure for connecting the power cable (C1 connection)

Preparation: Phillips-head screwdriver (No. 2), service key (projector accessory)
WARNING
• Before connecting the power cable, make sure that the AC power supply is disconnected. Otherwise a fire or electric shock
may occur.
• High leakage current flows. Do NOT connect the power supply before grounding connection.
1
Remove the plate inlet.
Remove the plate inlet by loosening the fixing screws (at four points).
In Europe, replace it with the supplied φ35 plate inlet. Use the fixing screws that were used before the replacement of the
plate inlet.
Plate Inlet
2
Pass the power cable through the cable hole of the plate.
If you use the supplied φ35 plate inlet, pass the power cable through a commercially available cable stopper and then
insert it into the cable hole.
Cable stopper
3
Remove the terminal cover of the power supply terminals.
Remove the terminal cover by pulling it upward.
Setting Up Your Projector
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

Np-18lu01Np-24lu01Np-20lu01

Table of Contents