FRIEDLAND SPECTRA Lite Instruction Manual
Hide thumbs Also See for SPECTRA Lite:

Advertisement

Quick Links

BEFORE STARTING ANY INSTALLATION WORK, PLEASE READ CAREFULLY
List Number L110N WHI
Always follow the manufacturers advice when using power tools, steps, ladders etc. and wear suitable
protective equipment (e.g. safety goggles when drilling holes). Before drilling holes in walls, check forhidden
electricity cables and water pipes, the use of a cable/pipe locater maybe advisable if in doubt.
The mains supply to this product should be installed by a competent person (e.g. a qualified electrician) in
accordance with these instructions and in accordance with the appropriate clauses of the current edition of
DANGER - 230 VOLTS. To prevent the risk of electrocution, always turn off the mains electricity supply
before commencing any work on the installation or opening the detector.
It is essential that all connections are made as instructed, that cables are not stressed and that terminals
Suitable for connection to fixed luminaires only. Internal and connected lamps loads must not exceed the
specified maximums. This product is suitable for wall mounting only.
Instruction Manual
the IEEE wiring regulations (BS7671).
are fully tightened.

PARTS INCLUDED

- Bulkhead PIR light
- Instruction Manual
- Accessory pack

TOOLS NEEDED

Drill and 6mm Masonry Drill Bit
Wire cutters and Wire Strippers
No.2 philips Screwdriver
Terminal or Electricians Screwdriver
Large Flat Bladed screwdriver

SAFETY

Lite

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPECTRA Lite and is the answer not in the manual?

Questions and answers

Summary of Contents for FRIEDLAND SPECTRA Lite

  • Page 1 Lite Instruction Manual BEFORE STARTING ANY INSTALLATION WORK, PLEASE READ CAREFULLY PARTS INCLUDED - Bulkhead PIR light - Instruction Manual - Accessory pack TOOLS NEEDED Drill and 6mm Masonry Drill Bit Wire cutters and Wire Strippers No.2 philips Screwdriver Terminal or Electricians Screwdriver Large Flat Bladed screwdriver List Number L110N WHI SAFETY...
  • Page 2 ACROSS its field of vision [Fig. 2], rather SELECTING A than movement directly toward it [Fig. 3] - LOCATION so if possible, mount the PIR facing ACROSS the approach to your property. Your PIR Detector has a number of detection zones at various horizontal and vertical angles, as shown.
  • Page 3 YOU CAN CONNECT ADDITIONAL LIGHT Ensure the unit is in an upright position with UNITS TO SPECTRA LITE. the sensor module at the bottom. The PIR detector will control the additional Mark the position of the fitting holes.
  • Page 4 Step 2 OPERATION & Apply the power by switching on the circuit TESTING breaker/internal wall switch. The lamp will immediately illuminate as the system goes through its ‘warm-up’ period. After Walk testing approximately 30 secs - 1 min the lamp will extinguish.
  • Page 5 Step 6 At this position, the unit should become Carry out Walk Tests and adjustments until operative at approximately the same level you are happy with the coverage area. of darkness each evening. Observe the operation of the unit over a period of a few Setting up for automatic days.
  • Page 6 TROUBLESHOOTING GUIDE REMEMBER Always ensure the mains supply to the unit is isolated before removing covers which allow access to live parts. PROBLEM SOLUTION The unit may be suffering from false activation. Cover the sensor lens Light stays ON all the completely with a thick cloth.
  • Page 7 TECHNICAL SPECIFICATIONS Detection Range Up to 8 metres Angle of Detection 110° Power supply 220-240V AC~50Hz Internal Lamp 60W max Maximum Switchable Load 2000W Tungsten Filament or 2000W Tungsten Halogen or 500W Fluorescent Time On Adjustment 5 seconds - 15 minutes Lux Level Adjustment Day &...
  • Page 8 1) Proof of purchase. 2) A full description of the fault. Friedland is a trademark of Novar ED&S. HELPLINE If you have any problems with this product, please call the Helpline on 01268 563066 (Lines open 9.00am to 5.00pm, Monday to Friday) Friedland, Novar Electrical Devices and Systems The Arnold Centre, Paycocke Road, Basildon, Essex.

Table of Contents